Sangachal Oil and Gas Processing Terminal
Jump to navigation
Jump to search
Contents
Summary Information
- Ownership: BP
- Website:
- Location: Located 55km south of Baku
- Capacity:
- Crude Type:
Brief Description
- Located 55km south of Baku, the Sangachal terminal is a vital link in Azerbaijan’s oil and gas industry. It is an oil and gas terminal that receives, processes, stores and exports crude oil and gas produced from all currently operated bp assets in the Caspian basin
- Sangachal Terminal covers an area of 542 hectares, which makes it one of the world's largest oil and gas terminals
- These include the Shah Deniz Gas Field and Azeri-Chirag-Guneshli Oil Field
- The terminal includes oil and gas processing facilities, the first pump station for the Baku Tbilisi Ceyhan Pipeline and South Caucasus Gas Pipeline compressor and other facilities.
Contractors
- **KBR:** Two gas processing trains with 900 mmscf/d capacity each and condensate processing facilities with about 105 mbd capacity
- **Aker Solutions:**
- Heater Treater Upgrade
- Engineering and subcontract fabrication of an H2S Scavenging vessel
- 1 Treater Vessel c/w 2 37.5 Kva transformers, two firetubes and 5 desand stations
- Fabrication of one (1) 12' x 60'-0" s/s (145,000 BOPD) multi-phase Separator and four (4) 12" x 50'-0" s/s (32,280 BOPD each) multi-stage Heater Treaters for crude oil dehydration
- Design, procurement and fabrication of electrostatic internals for four (4) 12’-0” Ø x 65’-0” T/T Coalescers
Ongoing Projects
- -
Other Information
- -
History
- 2014 - KBR Awarded Design Contract by BP for Shah Deniz Stage 2