Abarrelfull (talk | contribs)  (Created page with "Summary Information * Operator: Conoco  * Country: Canada  * Location: 60 kilometers southeast of Fort McMurray in Alberta * Production start:  * Partners: Conoco - 50%, Total...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 30: | Line 30: | ||
* 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2  | * 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2  | ||
* 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2  | * 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2  | ||
| + | * 2023 - Suncor acquired Total's stake  | ||
+++ Geology  | +++ Geology  | ||
| Line 40: | Line 41: | ||
# [http://killajoules.wikidot.com/archive:surmont-project-enters-commercial-production Surmont Project Enters Commercial Production]  | # [http://killajoules.wikidot.com/archive:surmont-project-enters-commercial-production Surmont Project Enters Commercial Production]  | ||
# [http://www.bantrel.com/surmont-2-project ConocoPhillips Surmont Phase 2 Project, Bantrell]  | # [http://www.bantrel.com/surmont-2-project ConocoPhillips Surmont Phase 2 Project, Bantrell]  | ||
| + | # [https://a-barrel-full.blogspot.com/2023/04/suncor-energy-to-acquire-totalenergies.html Suncor Energy to Acquire TotalEnergies' Canadian Operations for $5.5 Billion, Plus Additional Potential Payments up to an Aggregate Maximum of $600 Million]  | ||
| + | |||
| + | [[category:Field]]  | ||
| + | [[category:Canada]]  | ||
| + | [[category:ConocoPhillips]]  | ||
| + | [[category:Suncor]]  | ||
Revision as of 14:38, 27 April 2023
Summary Information
- Operator: Conoco
 - Country: Canada
 - Location: 60 kilometers southeast of Fort McMurray in Alberta
 - Production start:
 - Partners: Conoco - 50%, Total - 50%
 - Type: Oil / Gas
 - Estimated Reserves:
 - Production Volume: 26,000
 
+++ Description
- A Steam Assisted Gravity Drainage project
 
+++ Contractors ++++ Surmont Phase 2
- **Bantrel:**
 
* Front-end engineering activities (FEL-3) * Engineering Procurement & Construction
- **Aker Solutions:**
 
* Slop Oil Treater Package * 2 FWKO Vessels c/w insulation; platform; sample box; sample tubing & sample cooler - 13 ID x 60 * 2 Treater Vessels c/w insulation; platform; sample tubing; sample cooler & sample box 13 ID x 80
+++ History
- 1997 - The initial Surmont pilot project began
 - 2003 - The joint venture decided to launch the first phase of commercial development
 - 2005 - Total increased its stake to 50%
 - 2007 - Surmont Project Enters Commercial Production
 - 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2
 - 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2
 - 2023 - Suncor acquired Total's stake
 
+++ Geology
+++ Links
- [[[Aker Solutions Oil And Gas Processing References]]]
 - IMV Projects Awarded Surmont Development Study by ConocoPhillips Canada
 - Canada : Total increases its share in the Surmont oil sands leases to 50 %
 - Surmont Project Enters Commercial Production
 - ConocoPhillips Surmont Phase 2 Project, Bantrell
 - Suncor Energy to Acquire TotalEnergies' Canadian Operations for $5.5 Billion, Plus Additional Potential Payments up to an Aggregate Maximum of $600 Million