Difference between revisions of "Qingning Natural Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 13: Line 13:
  
 
=== History ===
 
=== History ===
* 2020 - The pipleine began operations
+
* 2020 - Ownersh
 +
* 2020 - The pipeline began operations
  
 
=== Other Information ===
 
=== Other Information ===

Revision as of 12:49, 21 December 2021

Summary Information

  • Source:
  • Destination:
  • Ownership: ChinaPipeline
  • Website:
  • Length: kilometres ( miles)
  • Capacity: 7.2 BCM / annum
  • Status: Operating

Details

  • It starts at the Qingdao of Shandong Sinopec LNG receiving station and ends at the Nanjing Gas Transmission Station of the National Pipeline Network Group Sichuan Gas to the East.

History

  • 2020 - Ownersh
  • 2020 - The pipeline began operations

Other Information

  • -

Links

  1. Qingning Natural Gas Pipeline Completed