Qingning Natural Gas Pipeline
Jump to navigation
Jump to search
Summary Information
- Source:
- Destination:
- Ownership: ChinaPipeline
- Website:
- Length: kilometres ( miles)
- Capacity: 7.2 BCM / annum
- Status: Operating
Details
- It starts at the Qingdao of Shandong Sinopec LNG receiving station and ends at the Nanjing Gas Transmission Station of the National Pipeline Network Group Sichuan Gas to the East.
History
- 2020 - Ownership transfered from Sinopec to ChinaPipeline
- 2020 - The pipeline began operations
Other Information
- -