Difference between revisions of "Sepia Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
| Line 31: | Line 31: | ||
# [https://abarrelfull.blogspot.com/2021/12/early-production-system-starts-up-in.html Early Production System starts up in the Santos Basin's Sepia pre-salt] | # [https://abarrelfull.blogspot.com/2021/12/early-production-system-starts-up-in.html Early Production System starts up in the Santos Basin's Sepia pre-salt] | ||
# [https://abarrelfull.blogspot.com/2021/12/contracting-of-fpso-for-sepia-field.html Contracting of FPSO for Sepia field] | # [https://abarrelfull.blogspot.com/2021/12/contracting-of-fpso-for-sepia-field.html Contracting of FPSO for Sepia field] | ||
| + | # [https://abarrelfull.blogspot.com/2021/12/mcdermott-awarded-epci-contract-by.html McDermott Awarded EPCI Contract by Petrobras for Sepia Field Project] | ||
# [https://abarrelfull.blogspot.com/2021/12/modecs-fpso-carioca-mv30-achieves-first.html MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter] | # [https://abarrelfull.blogspot.com/2021/12/modecs-fpso-carioca-mv30-achieves-first.html MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter] | ||
Revision as of 15:55, 8 December 2021
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: Santos Basin
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Sépia Leste field is at approximately 250 km and the Sépia field 185 km from the coast of Rio de Janeiro state, at a depth of 2,165 meters.
- The permanent development utilises the Carioca FPSO MV30 but an early production system used Cidade de São Vicente FPSO
Contractors
- MODEC: Engineering, procurement, construction, mobilization and installation of the FPSO, including topsides processing equipment as well as hull and marine systems.
- Sofec designed and provided the spread mooring system
History
- 2014 - The Sépia field was declared commercially viable
- 2015 - The Sépia Leste field was declared commercially viable
- 2016 - Early production system produces oil for 180 days
- 2017 - Modec awarded FPSO contract
- 2021 - First oil produced
Geology
Links
- Declaration of the Commercial Viability of the Sépia Leste area, in the pre-salt layer of the Santos Basin
- Early Production System starts up in the Santos Basin's Sepia pre-salt
- Contracting of FPSO for Sepia field
- McDermott Awarded EPCI Contract by Petrobras for Sepia Field Project
- MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter