Sepia Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: Santos Basin
- Production start: 2021
- Partners: PETRONAS (21%), Petrobras (30%), TotalEnergies (28%) and QatarEnergy (21%).
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: 170,000 bpd (2022)
Description
- The Sépia Leste field is at approximately 250 km and the Sépia field 185 km from the coast of Rio de Janeiro state, at a depth of 2,165 meters.
- The permanent development utilises the Carioca FPSO MV30 but an early production system used Cidade de São Vicente FPSO
- A total of 15 wells are planned, but the first phase includes seven-riser wells (3 producers and 4 injector wells)
- The P-85 FPSO will be added to the field in 2028 as part of the phase 2 development
Contractors
- MODEC: Engineering, procurement, construction, mobilization and installation of the FPSO, including topsides processing equipment as well as hull and marine systems.
- Sofec designed and provided the spread mooring system
- McDermott Detailed engineering, surveys, supply, installation and pre-commissioning of rigid pipelines, jumpers, buoyance modules, strakes and riser monitoring systems for seven-riser wells (3 producers and 4 injector wells) connected to the Carioca FPSO MV30
Phase 2
- Seatrium: EPC for FPSO
History
- 2014 - The Sépia field was declared commercially viable
- 2015 - The Sépia Leste field was declared commercially viable
- 2016 - Early production system produces oil for 180 days
- 2017 - Modec awarded FPSO contract
- 2021 - First oil produced
- 2021 - Petronas becomes 21% shareholder and Qatarenergy 14.4% owner
- 2022 - New oil discovery made in the field
- 2024 - FID for second phase development
Geology
- The field is located in the pre-salt
Links
- Declaration of the Commercial Viability of the Sépia Leste area, in the pre-salt layer of the Santos Basin
- Early Production System starts up in the Santos Basin's Sepia pre-salt
- Contracting of FPSO for Sepia field
- McDermott Awarded EPCI Contract by Petrobras for Sepia Field Project
- MODEC’s FPSO Carioca MV30 achieves First Oil and starts 21-Year Time Charter
- PETRONAS Wins Sépia Field In Brazil Bid Round
- Qatarenergy announces hydrocarbon discovery in Brazil’s Sépia field
- Brazil: TotalEnergies expands its pre-salt footprint on giant low-cost and low emissions reserves
- Petrobras on P-84 and P-85 contracting process
- Qatarenergy Announces FID In the Second Development Phase For Brazil’s Sépia Field