Difference between revisions of "Sepia Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 14: | Line 14: | ||
=== Contractors === | === Contractors === | ||
− | * | + | * '''MODEC:''' Engineering, procurement, construction, mobilization and installation of the FPSO, including topsides processing equipment as well as hull and marine systems. |
+ | * '''Sofec''' designed and provided the spread mooring system | ||
=== History === | === History === |
Revision as of 15:53, 8 December 2021
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: Santos Basin
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Sépia Leste field is at approximately 250 km and the Sépia field 185 km from the coast of Rio de Janeiro state, at a depth of 2,165 meters.
- The permanent development utilises the Carioca FPSO MV30 but an early production system used Cidade de São Vicente FPSO
Contractors
- MODEC: Engineering, procurement, construction, mobilization and installation of the FPSO, including topsides processing equipment as well as hull and marine systems.
- Sofec designed and provided the spread mooring system
History
- 2014 - The Sépia field was declared commercially viable
- 2015 - The Sépia Leste field was declared commercially viable
- 2016 - Early production system produces oil for 180 days
- 2017 - Modec awarded FPSO contract
- 2021 - First oil produced