Difference between revisions of "Valley Crossing Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 7: Line 7:
 
* Length:  kilometres (168 miles)  
 
* Length:  kilometres (168 miles)  
 
* Capacity: 2bcf per day  
 
* Capacity: 2bcf per day  
* Status: (Operating/Planned/Under Construction)
+
* Status: Operating
  
 
=== Details ===
 
=== Details ===
 
* 168-mile line running from the [[Agua Dulce Natural Gas Hub]], Texas, to the Gulf of Mexico east of Brownsville with the capacity to move up to 2.6 billion cubic feet a day (Bcf/d) of natural gas south of the border.
 
* 168-mile line running from the [[Agua Dulce Natural Gas Hub]], Texas, to the Gulf of Mexico east of Brownsville with the capacity to move up to 2.6 billion cubic feet a day (Bcf/d) of natural gas south of the border.
* It connects with the  
+
* It connects with the [[Sur de Texas – Tuxpan Gas Pipeline]]
 +
* An extension to the line will supply the [[Port of Brownsville LNG Export Terminal Project]]
  
  
 
=== History ===
 
=== History ===
 
* 2018 - The pipeline began operations
 
* 2018 - The pipeline began operations
 +
* 2022 - Texas LNG signs contract with Enbridge for gas transportation
  
 
=== Other Information ===
 
=== Other Information ===
Line 22: Line 24:
 
=== Links ===
 
=== Links ===
 
# [https://abarrelfull.blogspot.com/2025/12/a-massive-tex-mex-natgas-development.html A massive Tex-Mex natgas development: Valley Crossing Pipeline enters service]
 
# [https://abarrelfull.blogspot.com/2025/12/a-massive-tex-mex-natgas-development.html A massive Tex-Mex natgas development: Valley Crossing Pipeline enters service]
 +
# [https://abarrelfull.blogspot.com/2025/12/texas-lng-glenfarne-group-company-and.html Texas LNG, a Glenfarne Group Company, and Enbridge Execute Natural Gas Pipeline Transportation Agreement]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:USA]]
 
[[category:USA]]
 
[[category:Enbridge]]
 
[[category:Enbridge]]

Latest revision as of 17:06, 18 December 2025

Summary Information

  • Source: Agua Dulce, Texas
  • Destination: Gulf of Mexico east of Brownsville
  • Ownership: Enbridge
  • Website: https://www.enbridge.com/
  • Length: kilometres (168 miles)
  • Capacity: 2bcf per day
  • Status: Operating

Details


History

  • 2018 - The pipeline began operations
  • 2022 - Texas LNG signs contract with Enbridge for gas transportation

Other Information

  • -

Links

  1. A massive Tex-Mex natgas development: Valley Crossing Pipeline enters service
  2. Texas LNG, a Glenfarne Group Company, and Enbridge Execute Natural Gas Pipeline Transportation Agreement