(Created page with "Rousette Field Pipeline System Review Gabon KW1601 Setanta Energy / Procyon Oil & Gas 2011 Identification of feasible options for installing and trenching the 10" production...")
 
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
Rousette Field Pipeline  
+
# '''Rousette Field Pipeline'''
System Review
+
#* System Review
Gabon
+
#* Gabon
KW1601 Setanta Energy / Procyon Oil & Gas 2011 Identification of feasible options for installing and trenching the 10" production pipeline for the Rousette Field, located approximately 12km offshore Gabon in 46m of water. The project entails installation of a minimum facilities well head platform, subsea pipelines connecting to shore and an onshore processing facility, to be completed in three phases.  
+
#* KW1601
International Crude Oil  
+
#* Setanta Energy / Procyon Oil & Gas
Export Expansion Project  
+
#* 2011
(ICOEEP) Iraq
+
#* Identification of feasible options for installing and trenching the 10" production pipeline for the Rousette Field, located approximately 12km offshore Gabon in 46m of water. The project entails installation of a minimum facilities well head platform, subsea pipelines connecting to shore and an onshore processing facility, to be completed in three phases.  
KW1501 South Oil Company (SOC) / Leighton International 2011 Review of the available options for dredging backfill methodology for the Shore Approach and Offshore, in light of the available soils and metocean data. Preliminary assessment of what the backfill condition will be, and how changes to the methodology could improve the situation. The potential effect of the operation on the lines, given the proposed schedule and contents of the lines, is key. Consideration is given to how the potential methods affect the condition of the backfill and thus its suitability for the proposed stabilisation. Selection of the preferred solution for detailed review.
+
# '''International Crude Oil Export Expansion Project (ICOEEP)'''
Poleng Field  
+
#* Iraq
Indonesia KW1403 Kodeca Energy / OIS 2011 Detailed engineering assessment for the pipeline integrity and slope stability during the lowering of a 16" live gas pipeline from a burial depth of 3m to 6m in two locations, with a combined length of 1.5km. The existing 16" submarine pipeline is located 70km from PPP to ORF, located in the Poleng Field off East Java, Indonesia.
+
#* KW1501
Inpex Icthys Pipeline  
+
#* South Oil Company (SOC) / Leighton International
Optimisation Project
+
#* 2011
Australia KW1473 Inpex / Leighton International 2011 Review of the FEED data, pipeline stability, rock berm stability, global buckling screening and assessment, OBR and optimization as well as the trenchability assessment.
+
#* Review of the available options for dredging backfill methodology for the Shore Approach and Offshore, in light of the available soils and metocean data. Preliminary assessment of what the backfill condition will be, and how changes to the methodology could improve the situation. The potential effect of the operation on the lines, given the proposed schedule and contents of the lines, is key. Consideration is given to how the potential methods affect the condition of the backfill and thus its suitability for the proposed stabilisation. Selection of the preferred solution for detailed review.
Zirku Facilities Project U.A.E.
+
# '''[[Poleng TAC Oil and Gas Field]]'''
KW1538 EPC / NPCC 2011 Verification and endorsement of the basic engineering documents, drawings, specifications and MTO’s for the two 12" flexible pipelines located between the oily water treatment facilities at Zirku Island and the offshore disposal well platform ZWDP, with provision of an additional 12" line for future use. Identification of technical inconsistencies as well as cost benefit measures to be implemented during the EPC phase of the project.
+
#* Indonesia
# ‘‘‘[[Tweneboa Enyenra And Ntomme Ten Oil And Fields]]’‘‘
+
#* KW1403
 +
#* Kodeca Energy / OIS
 +
#* 2011
 +
#* Detailed engineering assessment for the pipeline integrity and slope stability during the lowering of a 16" live gas pipeline from a burial depth of 3m to 6m in two locations, with a combined length of 1.5km. The existing 16" submarine pipeline is located 70km from PPP to ORF, located in the Poleng Field off East Java, Indonesia.
 +
# '''[[Ichthys Gas Field]]'''
 +
#* Pipeline Optimisation Project
 +
#* Australia
 +
#* KW1473
 +
#* Inpex / Leighton International
 +
#* 2011
 +
#* Review of the FEED data, pipeline stability, rock berm stability, global buckling screening and assessment, OBR and optimization as well as the trenchability assessment.
 +
# '''[[Zirku Oil Processing Plant]]'''
 +
#* Zirku Facilities Project
 +
#* U.A.E.
 +
#* KW1538
 +
#* EPC / NPCC
 +
#* 2011
 +
#* Verification and endorsement of the basic engineering documents, drawings, specifications and MTO’s for the two 12" flexible pipelines located between the oily water treatment facilities at Zirku Island and the offshore disposal well platform ZWDP, with provision of an additional 12" line for future use. Identification of technical inconsistencies as well as cost benefit measures to be implemented during the EPC phase of the project.
 +
# '''[[Tweneboa Enyenra and Ntomme (TEN) Oil and Gas Fields]]'''
 
#* Ghana
 
#* Ghana
 
#* KW1398
 
#* KW1398
Line 22: Line 40:
 
#* Following on, KW Ltd were retained as the subsea management team to oversee the Subsea FEED contractor.  
 
#* Following on, KW Ltd were retained as the subsea management team to oversee the Subsea FEED contractor.  
 
#* The subsea/FPSO development is offshore Ghana in approximately 1500m of water, encompassing three drill centres with manifolds, production and injection flowlines, umbilicals and riser system.
 
#* The subsea/FPSO development is offshore Ghana in approximately 1500m of water, encompassing three drill centres with manifolds, production and injection flowlines, umbilicals and riser system.
# ‘‘‘[[Golden Eagle Oil Field]]’‘‘
+
# '''[[Golden Eagle Oil Field]]'''
 
#* United Kingdom - North Sea
 
#* United Kingdom - North Sea
 
#* KW1571
 
#* KW1571
Line 28: Line 46:
 
#* 2011
 
#* 2011
 
#* Review of the FEED for the 4.5km production, 4.5km gas lift, 4.5km water injection, 17km gas export and 70km oil export pipelines, associated tie-in spoolpieces and subsea structures including infield SSIV’s, export SSIV’s, gas export PLEM and production manifold.
 
#* Review of the FEED for the 4.5km production, 4.5km gas lift, 4.5km water injection, 17km gas export and 70km oil export pipelines, associated tie-in spoolpieces and subsea structures including infield SSIV’s, export SSIV’s, gas export PLEM and production manifold.
Hilal B Platform P/Ls  
+
# '''Hilal B Platform P/Ls '''
Engineering Review
+
#* Engineering Review
Egypt
+
#* Egypt
KW1493 ENPPI / GUPCO 2011 Design verification of pipelines diversion from old route to the new Hilal B platform as well as constructability and installation verification of the new field development. Fitness for purpose assessment of stored 18" API 5L PSL-1 grade X52 line pipe for construction of the pipeline diversion to Hilal B platform.  
+
#* KW1493
Porto Tolle Carbon  
+
#* ENPPI / GUPCO
Capture System Project  
+
#* 2011
Italy
+
#* Design verification of pipelines diversion from old route to the new Hilal B platform as well as constructability and installation verification of the new field development. Fitness for purpose assessment of stored 18" API 5L PSL-1 grade X52 line pipe for construction of the pipeline diversion to Hilal B platform.  
KW1428 ENEL 2011 Provision of technical assistance, consulting services and FEED supervision associated with the CO2 compression, pipelines, and offshore CO2 injection platform. The project involves the replacement of 4 existing oil fired 660 MW units with advanced technology coal fired units and an associated post combustion carbon capture unit (CCU). The CO2, captured by the CCU, will be dehydrated, compressed and transported via an onshore and offshore pipeline system to be injected and geologically stored in a subsea reservoir in the Adriatic Sea.  
+
# '''Porto Tolle Carbon Capture System Project'''
Haifa Bay Pipeline
+
#* Italy
Israel
+
#* KW1428
KW0773 Petroleum & Energy  
+
#* ENEL
Infrastructures Ltd (PEI) 2010 Bid preparation, tender support, project cost estimate updates and technical evaluation including review of contractor’s submitted construction documentation. Technical assistance in support of severing a previous contract. Technical evaluation of the partially constructed temporary and permanent works. Support as above provided for a second construction contract.
+
#* 2011
# ‘‘‘[[Conwy Oil Field]]’‘‘
+
#* Provision of technical assistance, consulting services and FEED supervision associated with the CO2 compression, pipelines, and offshore CO2 injection platform. The project involves the replacement of 4 existing oil fired 660 MW units with advanced technology coal fired units and an associated post combustion carbon capture unit (CCU). The CO2, captured by the CCU, will be dehydrated, compressed and transported via an onshore and offshore pipeline system to be injected and geologically stored in a subsea reservoir in the Adriatic Sea.  
 +
# '''Haifa Bay Pipeline'''
 +
#* Israel
 +
#* KW0773
 +
#* Petroleum & Energy Infrastructures Ltd (PEI)
 +
#* 2010
 +
#* Bid preparation, tender support, project cost estimate updates and technical evaluation including review of contractor’s submitted construction documentation. Technical assistance in support of severing a previous contract. Technical evaluation of the partially constructed temporary and permanent works. Support as above provided for a second construction contract.
 +
# '''[[Conwy Oil Field]]'''
 
#* United Kingdom - Irish Sea
 
#* United Kingdom - Irish Sea
 
#* KW1282
 
#* KW1282
Line 46: Line 71:
 
#* 2010
 
#* 2010
 
#* Conwy East - Provide support for the preparation and review of the pipeline, diving and linepipe tenders. Provide support during Tender Evaluation of the Pipeline Installation and Diving and Tie-in contracts.
 
#* Conwy East - Provide support for the preparation and review of the pipeline, diving and linepipe tenders. Provide support during Tender Evaluation of the Pipeline Installation and Diving and Tie-in contracts.
# ‘‘‘[[Broom Oil Field]]’‘‘
+
# '''[[Broom Oil Field]]'''
 
#* United Kingdom - North Sea
 
#* United Kingdom - North Sea
 
#* KW1281
 
#* KW1281
Line 52: Line 77:
 
#* 2010
 
#* 2010
 
#* Augmentation Project - Technical review of detailed design and installation engineering documentation for PIP pipeline, spools, SSIV and towhead manifold piping.
 
#* Augmentation Project - Technical review of detailed design and installation engineering documentation for PIP pipeline, spools, SSIV and towhead manifold piping.
# ‘‘‘[[Valhall Oil Field]]’‘‘
+
# '''[[Valhall Oil Field]]'''
 
#* Norway
 
#* Norway
 
#* KW1129
 
#* KW1129
Line 58: Line 83:
 
#* 2010
 
#* 2010
 
#* Valhall Redevelopment Project - Independent verification services for the Valhall Redevelopment Project – Gas Lift Pipeline System comprising of pipelines, spools, riser caisson, PLETs and diverless connections.
 
#* Valhall Redevelopment Project - Independent verification services for the Valhall Redevelopment Project – Gas Lift Pipeline System comprising of pipelines, spools, riser caisson, PLETs and diverless connections.
Xanab-A
+
# '''[[Xanab Oil Field]]'''
Gulf of Mexico  
+
#* Xanab-A
(Mexican Sector)  
+
#* Gulf of Mexico (Mexican Sector)  
KW1206 PEMEX / Sacmag 2009 Review of the design of a 20" pipeline with a design temperature of 140°C and performance of the upheaval buckling analyses.
+
#* KW1206
Owner Engineer (cont.)
+
#* PEMEX / Sacmag
Project Owner / Client Date Scope of work
+
#* 2009
Sinan-F
+
#* Review of the design of a 20" pipeline with a design temperature of 140°C and performance of the upheaval buckling analyses.
Gulf of Mexico  
+
# '''[[Sinan Oil Field]]'''
(Mexican Sector)
+
#* Sinan-F
KW1224 PEMEX / Sacmag 2009 Review of the design of a 12" pipeline with a design temperature of 140°C and advising on how to deal with the aspects of the design affected by the HPHT conditions.
+
#* Gulf of Mexico (Mexican Sector)
# ‘‘‘[[Viking Gas Field]]’‘‘
+
#* KW1224
 +
#* PEMEX / Sacmag
 +
#* 2009
 +
#* Review of the design of a 12" pipeline with a design temperature of 140°C and advising on how to deal with the aspects of the design affected by the HPHT conditions.
 +
# '''[[Viking Gas Field]]'''
 
#* United Kingdom - North Sea
 
#* United Kingdom - North Sea
 
#* KW1104
 
#* KW1104
Line 74: Line 103:
 
#* 2009
 
#* 2009
 
#* VTS IVB - Review and verification of Saipem activities and pipeline detailed design.
 
#* VTS IVB - Review and verification of Saipem activities and pipeline detailed design.
# ‘‘‘[[Topaz Gas Field]]’‘‘
+
# '''[[Topaz Gas Field]]'''
 
#* United Kingdom - North Sea
 
#* United Kingdom - North Sea
 
#* KW0877
 
#* KW0877
Line 80: Line 109:
 
#* 2008
 
#* 2008
 
#* Provide support for the preparation and review of the pipeline, diving and linepipe tenders. Provide support during Tender evaluation of the Pipeline Installation and Diving and Tie-in contracts.
 
#* Provide support for the preparation and review of the pipeline, diving and linepipe tenders. Provide support during Tender evaluation of the Pipeline Installation and Diving and Tie-in contracts.
# ‘‘‘[[Auk Oil Field]]’‘‘
+
# '''[[Auk Oil Field]]'''
 
#* United Kingdom - North Sea
 
#* United Kingdom - North Sea
 
#* KW1102
 
#* KW1102
Line 86: Line 115:
 
#* 2007
 
#* 2007
 
#* Independent verification services for the Auk North subsea tie-back. Scope included manifold piping, pipeline and caisson riser design and installation aspects.
 
#* Independent verification services for the Auk North subsea tie-back. Scope included manifold piping, pipeline and caisson riser design and installation aspects.
# ‘‘‘[[Buzzard Oil Field]]’‘‘
+
# '''[[Buzzard Oil Field]]'''
 
#* United Kingdom - North Sea
 
#* United Kingdom - North Sea
 
#* KW0509
 
#* KW0509
Line 93: Line 122:
 
#* Review of Saipem detailed pipeline design. Verification of subsea Wye and Tee forgings using 3D FE methods.  
 
#* Review of Saipem detailed pipeline design. Verification of subsea Wye and Tee forgings using 3D FE methods.  
 
#* Critical review of six sub-sea structure designs.
 
#* Critical review of six sub-sea structure designs.
# ‘‘‘[[Kelvin Gas Field]]’‘‘
+
# '''[[Kelvin Gas Field]]'''
 
#* United Kingdom - North Sea
 
#* United Kingdom - North Sea
 
#* KW0920
 
#* KW0920
Line 107: Line 136:
 
#* 2006
 
#* 2006
 
#* Review of Detailed Design Documentation. Development of a Pipeline Management Plan and Strategy.
 
#* Review of Detailed Design Documentation. Development of a Pipeline Management Plan and Strategy.
# ‘‘‘[[Cannonball Gas Field]]’‘‘
+
# '''[[Cannonball Gas Field]]'''
 
#* Trinidad
 
#* Trinidad
 
#* KW0751
 
#* KW0751
Line 113: Line 142:
 
#* 2006
 
#* 2006
 
#* Represent BP on repair of a buckled pipeline.
 
#* Represent BP on repair of a buckled pipeline.
# [[Mimas and Tethys Gas Fields]]
+
# '''[[Mimas and Tethys Gas Fields]]'''
 
#* United Kingdom - North Sea
 
#* United Kingdom - North Sea
 
#* KW0904
 
#* KW0904
Line 119: Line 148:
 
#* 2006
 
#* 2006
 
#* Design review and verification. Installation analysis review and verification. Out-of-straightness analysis for installed pipeline.
 
#* Design review and verification. Installation analysis review and verification. Out-of-straightness analysis for installed pipeline.
Gulf of Aqaba Pipeline  
+
# Gulf of Aqaba Pipeline Development
Development
+
#* Egypt
Egypt
+
#* KW0406
KW0406 East Gas Company (EGC) 2002
+
#* East Gas Company (EGC)
-
+
#* 2002-2013
2013 Client’s Project Manager. Supervision of detailed pipeline design. Client’s representative during installation of pipeline and shore crossing. On-going supervision of annual surveys, and interpretation of survey data.
+
#* Client’s Project Manager. Supervision of detailed pipeline design. Client’s representative during installation of pipeline and shore crossing. On-going supervision of annual surveys, and interpretation of survey data.

Latest revision as of 14:02, 29 December 2024

  1. Rousette Field Pipeline
    • System Review
    • Gabon
    • KW1601
    • Setanta Energy / Procyon Oil & Gas
    • 2011
    • Identification of feasible options for installing and trenching the 10" production pipeline for the Rousette Field, located approximately 12km offshore Gabon in 46m of water. The project entails installation of a minimum facilities well head platform, subsea pipelines connecting to shore and an onshore processing facility, to be completed in three phases.
  2. International Crude Oil Export Expansion Project (ICOEEP)
    • Iraq
    • KW1501
    • South Oil Company (SOC) / Leighton International
    • 2011
    • Review of the available options for dredging backfill methodology for the Shore Approach and Offshore, in light of the available soils and metocean data. Preliminary assessment of what the backfill condition will be, and how changes to the methodology could improve the situation. The potential effect of the operation on the lines, given the proposed schedule and contents of the lines, is key. Consideration is given to how the potential methods affect the condition of the backfill and thus its suitability for the proposed stabilisation. Selection of the preferred solution for detailed review.
  3. Poleng TAC Oil and Gas Field
    • Indonesia
    • KW1403
    • Kodeca Energy / OIS
    • 2011
    • Detailed engineering assessment for the pipeline integrity and slope stability during the lowering of a 16" live gas pipeline from a burial depth of 3m to 6m in two locations, with a combined length of 1.5km. The existing 16" submarine pipeline is located 70km from PPP to ORF, located in the Poleng Field off East Java, Indonesia.
  4. Ichthys Gas Field
    • Pipeline Optimisation Project
    • Australia
    • KW1473
    • Inpex / Leighton International
    • 2011
    • Review of the FEED data, pipeline stability, rock berm stability, global buckling screening and assessment, OBR and optimization as well as the trenchability assessment.
  5. Zirku Oil Processing Plant
    • Zirku Facilities Project
    • U.A.E.
    • KW1538
    • EPC / NPCC
    • 2011
    • Verification and endorsement of the basic engineering documents, drawings, specifications and MTO’s for the two 12" flexible pipelines located between the oily water treatment facilities at Zirku Island and the offshore disposal well platform ZWDP, with provision of an additional 12" line for future use. Identification of technical inconsistencies as well as cost benefit measures to be implemented during the EPC phase of the project.
  6. Tweneboa Enyenra and Ntomme (TEN) Oil and Gas Fields
    • Ghana
    • KW1398
    • Tullow Oil
    • 2011
    • Initial scope included working as part of Tullow’s in-house team providing concept and pre-FEED engineering of the pipelines and flowline scope of the subsea development undertaking specialist studies including geohazards and SCR concept.
    • Following on, KW Ltd were retained as the subsea management team to oversee the Subsea FEED contractor.
    • The subsea/FPSO development is offshore Ghana in approximately 1500m of water, encompassing three drill centres with manifolds, production and injection flowlines, umbilicals and riser system.
  7. Golden Eagle Oil Field
    • United Kingdom - North Sea
    • KW1571
    • Nexen
    • 2011
    • Review of the FEED for the 4.5km production, 4.5km gas lift, 4.5km water injection, 17km gas export and 70km oil export pipelines, associated tie-in spoolpieces and subsea structures including infield SSIV’s, export SSIV’s, gas export PLEM and production manifold.
  8. Hilal B Platform P/Ls
    • Engineering Review
    • Egypt
    • KW1493
    • ENPPI / GUPCO
    • 2011
    • Design verification of pipelines diversion from old route to the new Hilal B platform as well as constructability and installation verification of the new field development. Fitness for purpose assessment of stored 18" API 5L PSL-1 grade X52 line pipe for construction of the pipeline diversion to Hilal B platform.
  9. Porto Tolle Carbon Capture System Project
    • Italy
    • KW1428
    • ENEL
    • 2011
    • Provision of technical assistance, consulting services and FEED supervision associated with the CO2 compression, pipelines, and offshore CO2 injection platform. The project involves the replacement of 4 existing oil fired 660 MW units with advanced technology coal fired units and an associated post combustion carbon capture unit (CCU). The CO2, captured by the CCU, will be dehydrated, compressed and transported via an onshore and offshore pipeline system to be injected and geologically stored in a subsea reservoir in the Adriatic Sea.
  10. Haifa Bay Pipeline
    • Israel
    • KW0773
    • Petroleum & Energy Infrastructures Ltd (PEI)
    • 2010
    • Bid preparation, tender support, project cost estimate updates and technical evaluation including review of contractor’s submitted construction documentation. Technical assistance in support of severing a previous contract. Technical evaluation of the partially constructed temporary and permanent works. Support as above provided for a second construction contract.
  11. Conwy Oil Field
    • United Kingdom - Irish Sea
    • KW1282
    • EOG / Vision Oil
    • 2010
    • Conwy East - Provide support for the preparation and review of the pipeline, diving and linepipe tenders. Provide support during Tender Evaluation of the Pipeline Installation and Diving and Tie-in contracts.
  12. Broom Oil Field
    • United Kingdom - North Sea
    • KW1281
    • Lundin / CSL
    • 2010
    • Augmentation Project - Technical review of detailed design and installation engineering documentation for PIP pipeline, spools, SSIV and towhead manifold piping.
  13. Valhall Oil Field
    • Norway
    • KW1129
    • BP Norge
    • 2010
    • Valhall Redevelopment Project - Independent verification services for the Valhall Redevelopment Project – Gas Lift Pipeline System comprising of pipelines, spools, riser caisson, PLETs and diverless connections.
  14. Xanab Oil Field
    • Xanab-A
    • Gulf of Mexico (Mexican Sector)
    • KW1206
    • PEMEX / Sacmag
    • 2009
    • Review of the design of a 20" pipeline with a design temperature of 140°C and performance of the upheaval buckling analyses.
  15. Sinan Oil Field
    • Sinan-F
    • Gulf of Mexico (Mexican Sector)
    • KW1224
    • PEMEX / Sacmag
    • 2009
    • Review of the design of a 12" pipeline with a design temperature of 140°C and advising on how to deal with the aspects of the design affected by the HPHT conditions.
  16. Viking Gas Field
    • United Kingdom - North Sea
    • KW1104
    • ConocoPhillips
    • 2009
    • VTS IVB - Review and verification of Saipem activities and pipeline detailed design.
  17. Topaz Gas Field
    • United Kingdom - North Sea
    • KW0877
    • RWE / Vision Oil
    • 2008
    • Provide support for the preparation and review of the pipeline, diving and linepipe tenders. Provide support during Tender evaluation of the Pipeline Installation and Diving and Tie-in contracts.
  18. Auk Oil Field
    • United Kingdom - North Sea
    • KW1102
    • Talisman
    • 2007
    • Independent verification services for the Auk North subsea tie-back. Scope included manifold piping, pipeline and caisson riser design and installation aspects.
  19. Buzzard Oil Field
    • United Kingdom - North Sea
    • KW0509
    • Encana
    • 2007
    • Review of Saipem detailed pipeline design. Verification of subsea Wye and Tee forgings using 3D FE methods.
    • Critical review of six sub-sea structure designs.
  20. Kelvin Gas Field
    • United Kingdom - North Sea
    • KW0920
    • ConocoPhillips / Subsea7
    • 2007
    • Review and verification of Subsea7 Design.
    • Installation analysis review and verification.
    • Out-of-straightness analysis for installed pipeline.
  21. Saqqara
    • Egypt
    • KW0884
    • BP
    • 2006
    • Review of Detailed Design Documentation. Development of a Pipeline Management Plan and Strategy.
  22. Cannonball Gas Field
    • Trinidad
    • KW0751
    • BP
    • 2006
    • Represent BP on repair of a buckled pipeline.
  23. Mimas and Tethys Gas Fields
    • United Kingdom - North Sea
    • KW0904
    • ConocoPhillips
    • 2006
    • Design review and verification. Installation analysis review and verification. Out-of-straightness analysis for installed pipeline.
  24. Gulf of Aqaba Pipeline Development
    • Egypt
    • KW0406
    • East Gas Company (EGC)
    • 2002-2013
    • Client’s Project Manager. Supervision of detailed pipeline design. Client’s representative during installation of pipeline and shore crossing. On-going supervision of annual surveys, and interpretation of survey data.