Difference between revisions of "Hibiscus Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 11: | Line 11: | ||
=== Description === | === Description === | ||
* The Hibiscus platform is installed in a water depth of 492 ft (150 m) | * The Hibiscus platform is installed in a water depth of 492 ft (150 m) | ||
| − | * There is a 67 mile (107 km), 24-inch pipeline from the development to the | + | * There is a 67 mile (107 km), 24-inch pipeline from the development to the [[Atlantic LNG Terminal]] |
* The [[Poinsettia Gas Field]] is tied back to the Hibiscus Platform | * The [[Poinsettia Gas Field]] is tied back to the Hibiscus Platform | ||
Latest revision as of 11:14, 16 July 2024
Summary Information
- Operator: BG-Group
- Country: Trinidad and Tobago
- Location: North Coast Marine Area (NCMA)
- Production start: 2002
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Hibiscus platform is installed in a water depth of 492 ft (150 m)
- There is a 67 mile (107 km), 24-inch pipeline from the development to the Atlantic LNG Terminal
- The Poinsettia Gas Field is tied back to the Hibiscus Platform
Contractors
- Heerema Marine Contractors: Installation
History
- 1975 - Hibiscus Gas Field discovered
- 2000 - The Government of Trinidad & Tobago approved the development
- 2002 - The Hibiscus field begins production