Difference between revisions of "Tianjin Timeast Offshore Engineering Platform References"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Jacket, Platform Fabrication and Installation # Jinzhou 9-3 Oil Field #* Riser Prefabrication and Installation of Submarine Pipeline #* CNOOC # Riser and Jacket Installa...")
 
 
(One intermediate revision by the same user not shown)
Line 21: Line 21:
 
+++ E/I Installation and Commissioning achievement
 
+++ E/I Installation and Commissioning achievement
  
CFD1-1FPSO Cable Laying of Communication System, Equipment Installation and Commissioning of Top Module 2004.12-2005.7
+
# [[Hai Yang Shi You 112 FPSO]]
COOEC
+
#* CFD1-1FPSO
 
+
#* Cable Laying of Communication System, Equipment Installation and Commissioning of Top Module
3 75000T-3# Oil Tanker Living Quarter I/E Construction, Equipment Installation, Cable Laying and System Commissioning. 2005.10-2006.2
+
#* 2004.12-2005.7
DSIC
+
#* COOEC
 
+
# 75000T-3# Oil Tanker Living Quarter I/E Construction, Equipment Installation, Cable Laying and System Commissioning. 2005.10-2006.2 DSIC
4 FPSO300000t/year FPSO I/E Design, Installation and Commissioning 2005.11-2007.5
+
# FPSO300000t/year FPSO I/E Design, Installation and Commissioning 2005.11-2007.5 CONCCO PHILLPS
CONCCO PHILLPS
+
# 75000T-6# Oil Tanker Living Quarter I/E Construction, Equipment Installation, Cable Laying and System Commissioning. 2006.3-2006.6 DSIC
 
+
# Wenchang FPSO Cable Laying of Communication System, Equipment Installation and Commissioning 2006.11-2007.10 CONCCO PHILLPS
5 75000T-6# Oil Tanker Living Quarter I/E Construction, Equipment Installation, Cable Laying and System Commissioning. 2006.3-2006.6
 
DSIC
 
 
 
6 Wenchang FPSO Cable Laying of Communication System, Equipment Installation and Commissioning 2006.11-2007.10
 
CONCCO PHILLPS
 

Latest revision as of 15:49, 3 July 2024

Jacket, Platform Fabrication and Installation

  1. Jinzhou 9-3 Oil Field
    • Riser Prefabrication and Installation of Submarine Pipeline
    • CNOOC
  2. Riser and Jacket Installation of 3# Island Submarine Pipeline Project
  3. Jidong Nanpu Oil Field
    • Jacket Fabrication and Installation 1-2# Island Submarine Pipeline
    • Petrochina
  4. Jacket Fabrication and Installation of Dagang Guanjiapu Oil Field Submarine Pipeline Project
  5. Liaohe Oil Field
    • Riser and Jacket Installation
    • 8 Kuai Submarine Pipeline Laying Project

+++ Offshore Lifting and Facilities Installation achievement

  1. Suizhong 36-1 Oil Field
    • SZ36-1 Transformer Lifting Project


+++ E/I Installation and Commissioning achievement

  1. Hai Yang Shi You 112 FPSO
    • CFD1-1FPSO
    • Cable Laying of Communication System, Equipment Installation and Commissioning of Top Module
    • 2004.12-2005.7
    • COOEC
  2. 75000T-3# Oil Tanker Living Quarter I/E Construction, Equipment Installation, Cable Laying and System Commissioning. 2005.10-2006.2 DSIC
  3. FPSO300000t/year FPSO I/E Design, Installation and Commissioning 2005.11-2007.5 CONCCO PHILLPS
  4. 75000T-6# Oil Tanker Living Quarter I/E Construction, Equipment Installation, Cable Laying and System Commissioning. 2006.3-2006.6 DSIC
  5. Wenchang FPSO Cable Laying of Communication System, Equipment Installation and Commissioning 2006.11-2007.10 CONCCO PHILLPS