Difference between revisions of "Lincolnshire Offshore Gas Gathering System (Loggs)"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:
 
=== Details ===
 
=== Details ===
 
* The Lincolnshire Offshore Gas Gathering System (LOGGS) development consists of a single ‘gas gathering’ complex which collected gas from a total of 16 ‘satellite’ platforms and 6 subsea centres up to ~55km from the main LOGGS installation.
 
* The Lincolnshire Offshore Gas Gathering System (LOGGS) development consists of a single ‘gas gathering’ complex which collected gas from a total of 16 ‘satellite’ platforms and 6 subsea centres up to ~55km from the main LOGGS installation.
The LOGGS Installation comprises of the following 5 jackets which are linked together by fixed bridges:
+
* The LOGGS Installation comprises of the following 5 jackets which are linked together by fixed bridges:
PR (Riser Platform);
+
** PR (Riser Platform);
PC (Compression Platform);
+
** PC (Compression Platform);
PP (Production Platform);
+
** PP (Production Platform);
PA (Accommodation Platform);
+
** PA (Accommodation Platform);
PD (North Valiant 1 Wellhead Platform).
+
** PD (North Valiant 1 Wellhead Platform).
 
* Only the Riser platform is unmanned
 
* Only the Riser platform is unmanned
 
* The system gathers gas from a large number of fields in the Southern North Sea and transports it to the [[Theddlethorpe Gas Processing Plant]]
 
* The system gathers gas from a large number of fields in the Southern North Sea and transports it to the [[Theddlethorpe Gas Processing Plant]]
Line 26: Line 26:
 
* The facility receives natural gas from the V-fields;
 
* The facility receives natural gas from the V-fields;
 
** [[Vampire, Viscount and Valkyrie Gas Fields]];  
 
** [[Vampire, Viscount and Valkyrie Gas Fields]];  
 +
** [[Valiant, Vanguard and Vulcan Gas Fields]];
 
* The [[Saturn Area Gas Fields]], [[Mimas and Tethys Gas Fields]]:  
 
* The [[Saturn Area Gas Fields]], [[Mimas and Tethys Gas Fields]]:  
 
** Saturn, Mimas and Tethys;  
 
** Saturn, Mimas and Tethys;  

Latest revision as of 12:32, 29 June 2024

Summary Information

  • Source: Southern North Sea
  • Destination: Theddlethorpe Gas Processing Plant
  • Ownership: Conocophillips
  • Website:
  • Length: kilometres ( miles)
  • Capacity: per day
  • Status: Operating

Details

  • The Lincolnshire Offshore Gas Gathering System (LOGGS) development consists of a single ‘gas gathering’ complex which collected gas from a total of 16 ‘satellite’ platforms and 6 subsea centres up to ~55km from the main LOGGS installation.
  • The LOGGS Installation comprises of the following 5 jackets which are linked together by fixed bridges:
    • PR (Riser Platform);
    • PC (Compression Platform);
    • PP (Production Platform);
    • PA (Accommodation Platform);
    • PD (North Valiant 1 Wellhead Platform).
  • Only the Riser platform is unmanned
  • The system gathers gas from a large number of fields in the Southern North Sea and transports it to the Theddlethorpe Gas Processing Plant

Contractors

  • Seaway Heavy Lifting: LOGGS Riser Platform

= Related Gas Fields

History

  • 1988 - Pipeline operations begin
  • 1993 - Riser platform installed
  • 2019 - Chrysaor acquired Conocophillips's stake in the pipeline
  • 2021 - Premier Oil and Chrysaor merge to create Harbour Energy

Other Information

  • HSM Offshore built the Accommodation Platform

Links

  1. Conocophillips, UK Upstream Environmental Statement 2011
  2. List Of Oil and Gas Production Platforms In The UK
  3. HSM Offshore Platform References
  4. FoundOcean Europe Subsea References
  5. ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries
  6. Harbour Energy to be admitted to trading