Difference between revisions of "Kaminho FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Name: * Field: * Country: * Ownership: * Website: * Field Operated By: * Capacity: bpd * Year of Completion: === Brief Description ===...") |
Abarrelfull (talk | contribs) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Name: | + | * Name: Kaminho FPSO |
| − | * Field: | + | * Field: [[Cameia and Golfinho Oil Fields]] |
| − | * Country: | + | * Country: Angola |
| − | * Ownership: | + | * Ownership: Total |
| − | * Website: | + | * Website: https://totalenergies.com/ |
| − | * Field Operated By: | + | * Field Operated By: Total |
* Capacity: bpd | * Capacity: bpd | ||
| − | * Year of Completion: | + | * Year of Completion: expected 2028 |
=== Brief Description === | === Brief Description === | ||
| − | * - | + | * It comprises the conversion of a Very Large Crude Carrier (VLCC) to a Floating Production Storage and Offloading vessel |
| + | * Designed to minimize greenhouse gas emissions and eliminate routine flaring, this FPSO is all-electric and associated gas will be fully reinjected into the reservoirs. | ||
=== Contractors === | === Contractors === | ||
| − | * | + | * '''Saipem:''' |
| + | ** Engineering, Procurement, Construction, Transportation and Commissioning of the Kaminho Floating Production Storage and Offloading (FPSO) vessel | ||
| + | ** Operation and Maintenance (O&M) of the FPSO for a firm period of 12 years | ||
=== Status === | === Status === | ||
| − | * | + | * Under construction |
=== History === | === History === | ||
| − | * - | + | * 2024 - Saipem awarded EPCTC contract |
=== Other Information === | === Other Information === | ||
| Line 29: | Line 32: | ||
=== Links === | === Links === | ||
| − | # [ ] | + | # [https://a-barrel-full.blogspot.com/2024/05/saipem-three-new-contracts-awarded-by.html Saipem: three new contracts awarded by TotalEnergies E&P Angola Block 20 for the Kaminho project for an overall amount of 3.7 billion USD] |
[[Category:FSPO]] | [[Category:FSPO]] | ||
[[Category:Angola]] | [[Category:Angola]] | ||
[[Category:Total]] | [[Category:Total]] | ||
Latest revision as of 07:11, 22 May 2024
Contents
Summary Information
- Name: Kaminho FPSO
- Field: Cameia and Golfinho Oil Fields
- Country: Angola
- Ownership: Total
- Website: https://totalenergies.com/
- Field Operated By: Total
- Capacity: bpd
- Year of Completion: expected 2028
Brief Description
- It comprises the conversion of a Very Large Crude Carrier (VLCC) to a Floating Production Storage and Offloading vessel
- Designed to minimize greenhouse gas emissions and eliminate routine flaring, this FPSO is all-electric and associated gas will be fully reinjected into the reservoirs.
Contractors
- Saipem:
- Engineering, Procurement, Construction, Transportation and Commissioning of the Kaminho Floating Production Storage and Offloading (FPSO) vessel
- Operation and Maintenance (O&M) of the FPSO for a firm period of 12 years
Status
- Under construction
History
- 2024 - Saipem awarded EPCTC contract
Other Information
- -