Difference between revisions of "Lincolnshire Offshore Gas Gathering System (Loggs)"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Southern North Sea * Destination: Theddlethorpe Gas Processing Plant * Ownership: Conocophillips * Website: * Length: kilometres ( miles)...") |
Abarrelfull (talk | contribs) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Source: Southern North Sea | * Source: Southern North Sea | ||
| Line 9: | Line 9: | ||
* Status: Operating | * Status: Operating | ||
| − | + | === Details === | |
| − | * | + | * The Lincolnshire Offshore Gas Gathering System (LOGGS) development consists of a single ‘gas gathering’ complex which collected gas from a total of 16 ‘satellite’ platforms and 6 subsea centres up to ~55km from the main LOGGS installation. |
| + | * The LOGGS Installation comprises of the following 5 jackets which are linked together by fixed bridges: | ||
| + | ** PR (Riser Platform); | ||
| + | ** PC (Compression Platform); | ||
| + | ** PP (Production Platform); | ||
| + | ** PA (Accommodation Platform); | ||
| + | ** PD (North Valiant 1 Wellhead Platform). | ||
| + | * Only the Riser platform is unmanned | ||
* The system gathers gas from a large number of fields in the Southern North Sea and transports it to the [[Theddlethorpe Gas Processing Plant]] | * The system gathers gas from a large number of fields in the Southern North Sea and transports it to the [[Theddlethorpe Gas Processing Plant]] | ||
| − | + | === Contractors === | |
| − | * | + | * '''Seaway Heavy Lifting:''' LOGGS Riser Platform |
| − | + | ==== Related Gas Fields === | |
* The facility receives natural gas from the V-fields; | * The facility receives natural gas from the V-fields; | ||
| − | ** [[Vampire, Viscount | + | ** [[Vampire, Viscount and Valkyrie Gas Fields]]; |
| − | * The [[Saturn Area Gas Fields]], [[Mimas | + | ** [[Valiant, Vanguard and Vulcan Gas Fields]]; |
| + | * The [[Saturn Area Gas Fields]], [[Mimas and Tethys Gas Fields]]: | ||
** Saturn, Mimas and Tethys; | ** Saturn, Mimas and Tethys; | ||
* The [[Jupiter Gas Field | Jupiter Area natural gas fields]]: | * The [[Jupiter Gas Field | Jupiter Area natural gas fields]]: | ||
| Line 26: | Line 34: | ||
** [[Audrey Gas Field | Ann, Alison, Annabel, Audrey]], [[Anglia Gas Field | Anglia]], Viking, [[Victor Gas Field | Victor]], Vixen and Victoria | ** [[Audrey Gas Field | Ann, Alison, Annabel, Audrey]], [[Anglia Gas Field | Anglia]], Viking, [[Victor Gas Field | Victor]], Vixen and Victoria | ||
| − | + | === History === | |
* 1988 - Pipeline operations begin | * 1988 - Pipeline operations begin | ||
| + | * 1993 - Riser platform installed | ||
| + | * 2019 - Chrysaor acquired Conocophillips's stake in the pipeline | ||
| + | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy | ||
| − | + | === Other Information === | |
* HSM Offshore built the Accommodation Platform | * HSM Offshore built the Accommodation Platform | ||
| − | + | === Links === | |
# [https://www.og.decc.gov.uk/web_files/ems/2012/ConocoPhillips-ems.pdf Conocophillips, UK Upstream Environmental Statement 2011] | # [https://www.og.decc.gov.uk/web_files/ems/2012/ConocoPhillips-ems.pdf Conocophillips, UK Upstream Environmental Statement 2011] | ||
# [[List Of Oil and Gas Production Platforms In The UK]] | # [[List Of Oil and Gas Production Platforms In The UK]] | ||
# [[HSM Offshore Platform References]] | # [[HSM Offshore Platform References]] | ||
# [[FoundOcean Europe Subsea References]] | # [[FoundOcean Europe Subsea References]] | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/conocophillips-completes-27-billion.html ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries] | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading] | ||
| + | |||
| + | [[category:Pipeline]] | ||
| + | [[category:UK]] | ||
| + | [[category:Harbour Energy]] | ||
Latest revision as of 12:32, 29 June 2024
Contents
Summary Information
- Source: Southern North Sea
- Destination: Theddlethorpe Gas Processing Plant
- Ownership: Conocophillips
- Website:
- Length: kilometres ( miles)
- Capacity: per day
- Status: Operating
Details
- The Lincolnshire Offshore Gas Gathering System (LOGGS) development consists of a single ‘gas gathering’ complex which collected gas from a total of 16 ‘satellite’ platforms and 6 subsea centres up to ~55km from the main LOGGS installation.
- The LOGGS Installation comprises of the following 5 jackets which are linked together by fixed bridges:
- PR (Riser Platform);
- PC (Compression Platform);
- PP (Production Platform);
- PA (Accommodation Platform);
- PD (North Valiant 1 Wellhead Platform).
- Only the Riser platform is unmanned
- The system gathers gas from a large number of fields in the Southern North Sea and transports it to the Theddlethorpe Gas Processing Plant
Contractors
- Seaway Heavy Lifting: LOGGS Riser Platform
= Related Gas Fields
- The facility receives natural gas from the V-fields;
- The Saturn Area Gas Fields, Mimas and Tethys Gas Fields:
- Saturn, Mimas and Tethys;
- The Jupiter Area natural gas fields:
- Ganymede, Sinope, Callisto, Europa and NW Bell;
- As well as the third-party fields:
- Ann, Alison, Annabel, Audrey, Anglia, Viking, Victor, Vixen and Victoria
History
- 1988 - Pipeline operations begin
- 1993 - Riser platform installed
- 2019 - Chrysaor acquired Conocophillips's stake in the pipeline
- 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
Other Information
- HSM Offshore built the Accommodation Platform