Difference between revisions of "P-77 FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 10: | Line 10: | ||
* Year of Completion: 2019 | * Year of Completion: 2019 | ||
− | + | === Brief Description === | |
* FPSO P-74 will be the first platform completed for the exploration of the pre-salt fields located in the Transfer of Rights region. The platform will be capable of producing up to 150,000 barrels/day and of compressing 7 million cubic meters of natural gas/day | * FPSO P-74 will be the first platform completed for the exploration of the pre-salt fields located in the Transfer of Rights region. The platform will be capable of producing up to 150,000 barrels/day and of compressing 7 million cubic meters of natural gas/day |
Latest revision as of 09:45, 12 June 2023
Contents
Summary Information
- Name: P-77 FPSO
- Field: Búzios Oil and Gas Field
- Country: Brazil
- Ownership: Petrobras
- Website: http://www.petrobras.com.br/
- Field Operated By: Petrobras
- Capacity: 150,000 bpd
- Year of Completion: 2019
Brief Description
- FPSO P-74 will be the first platform completed for the exploration of the pre-salt fields located in the Transfer of Rights region. The platform will be capable of producing up to 150,000 barrels/day and of compressing 7 million cubic meters of natural gas/day
- The project provides for its interconnection to nine production wells and eight injection wells.
- The vessel is a converted VLCC
Contractors
- **Norberto Odebrecht / UTC Engenharia:** Hull conversion
- **GE Oil & Gas:** Supply of gas turbines and electric generators, turbocompression trains and electric motor driven compressors for gas main, export services and CO2 re-injection
Status
- In operation
History
- 2012 - Norberto Odebrecht & UTC Engenharia awarded hull conversion contracts
- 2013 - GE awarded turbines & Compressors contract
- 2019 - The vessel arrived at the field
Other Information
- -