Difference between revisions of "Pegaga Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 2: | Line 2: | ||
* Operator: Mubadala | * Operator: Mubadala | ||
* Country: Malaysia | * Country: Malaysia | ||
− | * Location: Block 320 offshore | + | * Location: Block SK 320 offshore |
* Production start: 2022 | * Production start: 2022 | ||
* Partners: Mubadala, Petronas, Shell | * Partners: Mubadala, Petronas, Shell | ||
− | * Type: | + | * Type: Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
Line 19: | Line 19: | ||
=== History === | === History === | ||
* 2018 - Final investment decision taken | * 2018 - Final investment decision taken | ||
+ | * 2022 - First gas produced | ||
=== Geology === | === Geology === | ||
Line 25: | Line 26: | ||
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2023/03/pegaga-gas-development-in-malaysia.html Pegaga Gas Development in Malaysia Approved] | # [https://abarrelfull.blogspot.com/2023/03/pegaga-gas-development-in-malaysia.html Pegaga Gas Development in Malaysia Approved] | ||
− | + | # [https://abarrelfull.blogspot.com/2023/03/pegaga-field-enters-gas-production-phase.html Pegaga Field Enters Gas Production Phase] | |
[[category:Field]] | [[category:Field]] |
Latest revision as of 08:28, 22 March 2023
Summary Information
- Operator: Mubadala
- Country: Malaysia
- Location: Block SK 320 offshore
- Production start: 2022
- Partners: Mubadala, Petronas, Shell
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket.
- The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate.
- The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore Malaysia LNG plant in Bintulu.
Contractors
- Sapura Fabrication: Engineering, Procurement, Construction, Installation & Commissioning (EPCIC)
History
- 2018 - Final investment decision taken
- 2022 - First gas produced