Difference between revisions of "Sangachal Oil and Gas Processing Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: BP * Website: * Location: * Capacity: * Crude Type: +++ Brief Description * Located 55km south of Baku, the Sangachal Terminal is a vita...") |
Abarrelfull (talk | contribs) |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Ownership: BP | * Ownership: BP | ||
* Website: | * Website: | ||
| − | * Location: | + | * Location: Located 55km south of Baku |
* Capacity: | * Capacity: | ||
| − | * Crude Type: | + | * Crude Type: |
| − | + | === Brief Description === | |
| − | * Located 55km south of Baku, the Sangachal | + | * Located 55km south of Baku, the Sangachal terminal is a vital link in Azerbaijan’s oil and gas industry. It is an oil and gas terminal that receives, processes, stores and exports crude oil and gas produced from all currently operated bp assets in the Caspian basin |
* Sangachal Terminal covers an area of 542 hectares, which makes it one of the world's largest oil and gas terminals | * Sangachal Terminal covers an area of 542 hectares, which makes it one of the world's largest oil and gas terminals | ||
| − | * | + | * These include the [[Shah Deniz Gas Field]] and [[Azeri-Chirag-Guneshli Oil Field]] |
| − | * The terminal | + | * The terminal includes oil and gas processing facilities, the first pump station for the [[Baku Tbilisi Ceyhan Pipeline]] and [[South Caucasus Gas Pipeline]] compressor and other facilities. |
| − | + | === Contractors === | |
* **KBR:** Two gas processing trains with 900 mmscf/d capacity each and condensate processing facilities with about 105 mbd capacity | * **KBR:** Two gas processing trains with 900 mmscf/d capacity each and condensate processing facilities with about 105 mbd capacity | ||
* **Aker Solutions:** | * **Aker Solutions:** | ||
| − | + | ** Heater Treater Upgrade | |
| − | + | ** Engineering and subcontract fabrication of an H2S Scavenging vessel | |
| − | + | ** 1 Treater Vessel c/w 2 37.5 Kva transformers, two firetubes and 5 desand stations | |
| − | + | ** Fabrication of one (1) 12' x 60'-0" s/s (145,000 BOPD) multi-phase Separator and four (4) 12" x 50'-0" s/s (32,280 BOPD each) multi-stage Heater Treaters for crude oil dehydration | |
| − | + | ** Design, procurement and fabrication of electrostatic internals for four (4) 12’-0” Ø x 65’-0” T/T Coalescers | |
| − | + | === Ongoing Projects === | |
* - | * - | ||
| − | + | === Other Information === | |
* - | * - | ||
| − | + | === History === | |
* 2014 - KBR Awarded Design Contract by BP for Shah Deniz Stage 2 | * 2014 - KBR Awarded Design Contract by BP for Shah Deniz Stage 2 | ||
| − | + | === Links === | |
| − | # | + | # [[Aker Solutions Oil And Gas Processing References]] |
# [http://www.bp.com/sectiongenericarticle.do?categoryId=9006674&contentId=7015100 BP, Sangachal Oil Terminal] | # [http://www.bp.com/sectiongenericarticle.do?categoryId=9006674&contentId=7015100 BP, Sangachal Oil Terminal] | ||
# [http://killajoules.wikidot.com/blog:4857 KBR Awarded Major Engineering Design Contract by BP for Shah Deniz Stage 2 Project] | # [http://killajoules.wikidot.com/blog:4857 KBR Awarded Major Engineering Design Contract by BP for Shah Deniz Stage 2 Project] | ||
Latest revision as of 12:18, 31 October 2022
Contents
Summary Information
- Ownership: BP
- Website:
- Location: Located 55km south of Baku
- Capacity:
- Crude Type:
Brief Description
- Located 55km south of Baku, the Sangachal terminal is a vital link in Azerbaijan’s oil and gas industry. It is an oil and gas terminal that receives, processes, stores and exports crude oil and gas produced from all currently operated bp assets in the Caspian basin
- Sangachal Terminal covers an area of 542 hectares, which makes it one of the world's largest oil and gas terminals
- These include the Shah Deniz Gas Field and Azeri-Chirag-Guneshli Oil Field
- The terminal includes oil and gas processing facilities, the first pump station for the Baku Tbilisi Ceyhan Pipeline and South Caucasus Gas Pipeline compressor and other facilities.
Contractors
- **KBR:** Two gas processing trains with 900 mmscf/d capacity each and condensate processing facilities with about 105 mbd capacity
- **Aker Solutions:**
- Heater Treater Upgrade
- Engineering and subcontract fabrication of an H2S Scavenging vessel
- 1 Treater Vessel c/w 2 37.5 Kva transformers, two firetubes and 5 desand stations
- Fabrication of one (1) 12' x 60'-0" s/s (145,000 BOPD) multi-phase Separator and four (4) 12" x 50'-0" s/s (32,280 BOPD each) multi-stage Heater Treaters for crude oil dehydration
- Design, procurement and fabrication of electrostatic internals for four (4) 12’-0” Ø x 65’-0” T/T Coalescers
Ongoing Projects
- -
Other Information
- -
History
- 2014 - KBR Awarded Design Contract by BP for Shah Deniz Stage 2