Difference between revisions of "P-53 FPSO"

From A Barrel Full
Jump to navigation Jump to search
(Created page with " * Name: P-53 FPSO * Field: Marlim Leste Oil Field * Country: Brazil * Ownership: Petrobras * Website: * Field Operated By: Petrobras * Capacity: bpd * Year of Complet...")
 
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
=== Summary Information ===
  
 
* Name: P-53 FPSO
 
* Name: P-53 FPSO
Line 9: Line 10:
 
* Year of Completion: 2008
 
* Year of Completion: 2008
  
+++ Brief Description
+
=== Brief Description ===
  
* The P-53 FPSO has total production capacity of 180,000 barrels per day of heavy oil, 20º API, and compressing capacity up to 6 million cubic meters/day of natural gas.  
+
* Built from the conversion of an oil tanker called Settebello, the P-53 FPSO has total production capacity of 180,000 barrels per day of heavy oil, 20º API, and compressing capacity up to 6 million cubic meters/day of natural gas.
 +
* The platform weighs some 12,000 tons, it is more than 73 m tall, its moonpool (an opening in the middle of the platform used to maneuver heavy duty equipment used in the sea) is 25 m in diameter, and the platform’s deck is 35 m in diameter, being able to operate with up to 75 flexible risers
  
+++ Contractors
+
=== Contractors ===
*  
+
* '''VWS Westgarth:''' single lift SRP module complete with cartridge filtration
  
+++ Status
+
=== Status ===
 
* In operation
 
* In operation
  
+++ History
+
=== History ===
 
* 2008 - Vessel achieves first oil
 
* 2008 - Vessel achieves first oil
  
+++ Other Information
+
=== Other Information ===
  
 
* -
 
* -
Line 28: Line 30:
 
=== Links ===
 
=== Links ===
  
 +
# [[VWS Westgarth FPSO References]]
 +
# [https://abarrelfull.blogspot.com/2021/12/the-new-platforms.html The new platforms]
 
# [http://killajoules.wikidot.com/archive:platform-p-53-kicks-off-production/ Platform P-53 kicks-off production]
 
# [http://killajoules.wikidot.com/archive:platform-p-53-kicks-off-production/ Platform P-53 kicks-off production]

Latest revision as of 14:25, 18 July 2024

Summary Information

  • Name: P-53 FPSO
  • Field: Marlim Leste Oil Field
  • Country: Brazil
  • Ownership: Petrobras
  • Website:
  • Field Operated By: Petrobras
  • Capacity: bpd
  • Year of Completion: 2008

Brief Description

  • Built from the conversion of an oil tanker called Settebello, the P-53 FPSO has total production capacity of 180,000 barrels per day of heavy oil, 20º API, and compressing capacity up to 6 million cubic meters/day of natural gas.
  • The platform weighs some 12,000 tons, it is more than 73 m tall, its moonpool (an opening in the middle of the platform used to maneuver heavy duty equipment used in the sea) is 25 m in diameter, and the platform’s deck is 35 m in diameter, being able to operate with up to 75 flexible risers

Contractors

  • VWS Westgarth: single lift SRP module complete with cartridge filtration

Status

  • In operation

History

  • 2008 - Vessel achieves first oil

Other Information

  • -

Links

  1. VWS Westgarth FPSO References
  2. The new platforms
  3. Platform P-53 kicks-off production