P-53 FPSO
		
		
		
		
		Jump to navigation
		Jump to search
		
Contents
Summary Information
- Name: P-53 FPSO
 - Field: Marlim Leste Oil Field
 - Country: Brazil
 - Ownership: Petrobras
 - Website:
 - Field Operated By: Petrobras
 - Capacity: bpd
 - Year of Completion: 2008
 
Brief Description
- Built from the conversion of an oil tanker called Settebello, the P-53 FPSO has total production capacity of 180,000 barrels per day of heavy oil, 20º API, and compressing capacity up to 6 million cubic meters/day of natural gas.
 - The platform weighs some 12,000 tons, it is more than 73 m tall, its moonpool (an opening in the middle of the platform used to maneuver heavy duty equipment used in the sea) is 25 m in diameter, and the platform’s deck is 35 m in diameter, being able to operate with up to 75 flexible risers
 
Contractors
- VWS Westgarth: single lift SRP module complete with cartridge filtration
 
Status
- In operation
 
History
- 2008 - Vessel achieves first oil
 
Other Information
- -