Difference between revisions of "Jawa-1 LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === === Technical Details === * Storage...")
 
 
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Ownership:  
+
* Ownership: Jawa Satu Regas (JSR) Pertamina, Marubeni and Sojitz
* Website:  
+
* Website: https://pertamina.com/
* Location:  
+
* Location: Cilamaya, West Java province, Java Island, Indonesia
* Capacity: million tons/annum
+
* Capacity: 2.4 million tons/annum
* Status:  
+
* Status: Commissioning 2021
 +
 
 
=== Brief Description ===
 
=== Brief Description ===
 
+
* The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities.
 +
* Gas is to be supplied by the Jawa Satu FSRU
 +
* The FSRU will be placed 14km offshore in the Cilamaya Sea, east of Jakarta and connected to the power plant via a pipeline about 21km long.
  
 
=== Technical Details ===
 
=== Technical Details ===
  
* Storage capacity:  
+
* Storage capacity: 170,000 M3
 
* Unloading capacity:
 
* Unloading capacity:
* Send out capacity:
+
* Send out capacity: 300 MMscfd
* Constructor:
+
* Constructor: Samsung Engineering made the vessel conversion
 
* Licensor:
 
* Licensor:
 +
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
  
Line 21: Line 25:
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
  
* Suppliers:
+
* Suppliers: LNG is to be supplied from BP’s [[Tangguh LNG Terminal]] in West Papua
* Customers:
+
* Customers: The terminal will supply a new power plant
 +
 
 
=== History ===
 
=== History ===
  
* 200X -  
+
* 2018 - The Asian development bank approved two loans totalling USD 370 million for the project
 +
 
 
=== Other Information ===
 
=== Other Information ===
  
 
-
 
-
 
=== Links ===
 
=== Links ===
#[https://www.adb.org/projects/51112-001/main Asian Development Bank]
+
# [https://www.adb.org/projects/51112-001/main Asian Development Bank]
 +
# [https://abarrelfull.blogspot.com/2021/03/mol-to-participate-in-construction.html MOL to Participate in Construction, Ownership, Operation of FSRU for Jawa 1 Gas-Fired IPP Project in Indonesia]

Latest revision as of 16:59, 16 March 2021

Summary Information

  • Ownership: Jawa Satu Regas (JSR) Pertamina, Marubeni and Sojitz
  • Website: https://pertamina.com/
  • Location: Cilamaya, West Java province, Java Island, Indonesia
  • Capacity: 2.4 million tons/annum
  • Status: Commissioning 2021

Brief Description

  • The project entails the construction, operation, and maintenance of a 1,760-megawatt (MW) load-following, combined-cycle, gas turbine (CCGT) power plant and associated facilities.
  • Gas is to be supplied by the Jawa Satu FSRU
  • The FSRU will be placed 14km offshore in the Cilamaya Sea, east of Jakarta and connected to the power plant via a pipeline about 21km long.

Technical Details

  • Storage capacity: 170,000 M3
  • Unloading capacity:
  • Send out capacity: 300 MMscfd
  • Constructor: Samsung Engineering made the vessel conversion
  • Licensor:

Ongoing Projects/Project Status

Suppliers / Customers

  • Suppliers: LNG is to be supplied from BP’s Tangguh LNG Terminal in West Papua
  • Customers: The terminal will supply a new power plant

History

  • 2018 - The Asian development bank approved two loans totalling USD 370 million for the project

Other Information

-

Links

  1. Asian Development Bank
  2. MOL to Participate in Construction, Ownership, Operation of FSRU for Jawa 1 Gas-Fired IPP Project in Indonesia