Difference between revisions of "Vega Pleyade Offshore Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 10: | Line 10: | ||
=== Description === | === Description === | ||
* The Vega Pleyade development consists of a wellhead platform in 50 meters water depth, tied back via a 77 kilometer offshore pipeline to the Total-operated Rio Cullen and Cañadon Alfa onshore treatment facilities | * The Vega Pleyade development consists of a wellhead platform in 50 meters water depth, tied back via a 77 kilometer offshore pipeline to the Total-operated Rio Cullen and Cañadon Alfa onshore treatment facilities | ||
| + | * Gas from the field will be supplied to the [[Southern Energy LNG Export Terminal]] | ||
=== Contractors === | === Contractors === | ||
Latest revision as of 13:51, 22 September 2026
Summary Information
- Country: Argentina
- Location: Offshore Southern Argentina
- Production start: 2016
- Partners: TotalEnergies 37.5%, Harbour Energy (37.5%) and Pan American Sur (25%).
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Vega Pleyade development consists of a wellhead platform in 50 meters water depth, tied back via a 77 kilometer offshore pipeline to the Total-operated Rio Cullen and Cañadon Alfa onshore treatment facilities
- Gas from the field will be supplied to the Southern Energy LNG Export Terminal
Contractors
- Dragados Offshore: engineering, procurement, construction (EPC), including in-house detail design, onshore commissioning, load-out and sea-fastening of the WHP topsides (1.500 tonnes), 4-legged jacket (1.000 tonnes), and piles
- Serimax: Pipelines
History
- 2015 - The platform is completed
- 2016 - First gas produced
- 2023 - Harbour Energy acquired Wintershall's stake