Difference between revisions of "Nasr Oil Field"

From A Barrel Full
Jump to navigation Jump to search
 
Line 48: Line 48:
 
# [http://killajoules.wikidot.com/blog:5580 Hyundai Heavy Industries Wins $1.94 Billion Offshore Order in UAE]
 
# [http://killajoules.wikidot.com/blog:5580 Hyundai Heavy Industries Wins $1.94 Billion Offshore Order in UAE]
 
# [http://killajoules.wikidot.com/blog:5957 ABB to provide power and automation solutions for oilfields off UAE coast]
 
# [http://killajoules.wikidot.com/blog:5957 ABB to provide power and automation solutions for oilfields off UAE coast]
 +
 +
[[category:Field]]
 +
[[category:UAE]]
 +
[[category:ADNOC]]

Latest revision as of 12:55, 29 December 2024

Summary Information

  • Operator: ADMA OPCO
  • Country: UAE - Abu Dhabi
  • Location: 131 km northwest of Abu Dhabi
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: 22,000 bpd

Description

  • The Nasr Full Field Development Project includes seven wellhead towers, super complex facilities including gas processing and oil separation production facilities, utilities platform, living quarters, infield subsea pipelines and an export pipeline to Das Island
  • Phase II is designed to increase production to 65,000 bpd
  • It includes the addition of a gas treatment platform, a separation platform and an accommodation platform as well as modifications to existing structures

Contractors

Phase I

  • Fluor: front-end engineering and design (FEED)
  • AMEC: Project Management Consultancy (PMC) services contract

Phase II

  • Technip: Project management consultancy (PMC) services
  • KBR: Engineering design and support services
  • HHI: Engineering, procurement, construction, installation and commissioning work
    • Gas treatment platform, a separation platform, an accommodation platform;
    • laying 144 km subsea power and 55 km infield cables;
    • modifying an existing manifold tower and two wellhead towers

History

  • 2011 - Fluor Wins Offshore FEED Contract
  • 2012 - AMEC awarded PMC services contract
  • 2014 - Project Management Consultancy services for the Nasr Phase II awarded to Technip
  • 2014 - Platforms EPC given to HHI

Geology

Links

  1. KWSubsea Lateral Buckling and Pipeline Walking References
  2. Shenzhen Chiwan Sembawang Engineering Platform References
  3. AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE
  4. Fluor Wins Offshore FEED Contract for Nasr Field in Abu Dhabi
  5. KBR Awarded Major Engineering Design Contract by Hyundai Heavy Industries Co., Limited for the Al-Nasr Full Field Development Project
  6. ADMA-OPCO selects Technip for Project Management Consultancy services for the Nasr Phase II Full Field Development Project
  7. Hyundai Heavy Industries Wins $1.94 Billion Offshore Order in UAE
  8. ABB to provide power and automation solutions for oilfields off UAE coast