Difference between revisions of "Arabiyah and Hasbah Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 28: | Line 28: | ||
=== Links === | === Links === | ||
+ | # [[KWSubsea Lateral Buckling and Pipeline Walking References]] | ||
# [[Saipem Fixed Offshore Production Facilities Project References]] | # [[Saipem Fixed Offshore Production Facilities Project References]] | ||
# [[Saipem Pipeline References]] | # [[Saipem Pipeline References]] | ||
# [http://killajoules.wikidot.com/blog:621 Saipem wins new E&C Offshore contracts worth in excess of $2.2 billion] | # [http://killajoules.wikidot.com/blog:621 Saipem wins new E&C Offshore contracts worth in excess of $2.2 billion] |
Latest revision as of 12:51, 29 December 2024
Summary Information
- Operator: Saudi Aramco
- Country: Saudi-Arabia
- Location: Eastern Province
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Arabiyah field is located to the northeast of Karan and straddles the marine border between KSA and Iran
- The development includes 12 wellhead platforms, 2 tie-in platforms and 1 injection platform
- Gas is transported to shore by a 36 inches 260-kilometres-long export trunkline
- The gas is to be processed in the Wasit Gas Processing Plant
Contractors
- Saipem: The complete development of the two fields
- Engineering, procurement, fabrication and installation of a total of 12 wellhead platforms, 2 tie-in platforms and 1 injection platform, besides to a 36 inches 260-kilometres-long export trunkline and approximately 200 kilometres of mono-ethylene glycol (MEG) pipelines, 200 kilometres of subsea electric and control cables and 40 kilometres of offshore flowlines.
- The scope of work also includes the shore approaches and about 120 kilometres of onshore pipelines.
History
- 2008 - Arabiyah field discovered
- 2011 - Saipem awarded EPCI contract
Geology
- The gas lies in the Khuff formation