Difference between revisions of "Cameia and Golfinho Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: * Country: * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: === Descrip...") |
Abarrelfull (talk | contribs) |
||
| (6 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Operator: | + | * Operator: Total |
| − | * Country: | + | * Country: Angola |
| − | * Location: | + | * Location: Kwanza basin, offshore |
| − | * Production start: | + | * Production start: expected 2028 |
| − | * Partners: | + | * Partners: TotalEnergies (40%), Petronas (40%) and Sonangol (20%) |
* Type: Oil / Gas | * Type: Oil / Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
| − | * Production Volume: | + | * Production Volume: Target is 70,000 bpd |
=== Description === | === Description === | ||
| − | * | + | * The development which is known as the Kaminho project is the first large deepwater development in the Kwanza basin |
| + | * It comprises the conversion of a Very Large Crude Carrier (VLCC) to a Floating Production Storage and Offloading, The [[Kaminho FPSO]], which will be connected to a subsea production network. | ||
| + | * Designed to minimize greenhouse gas emissions and eliminate routine flaring, this FPSO is all-electric and associated gas will be fully reinjected into the reservoirs. * Production start-up is expected in 2028, with a plateau of 70,000 barrels of oil per day. | ||
=== Contractors === | === Contractors === | ||
| − | * - | + | * '''Saipem:''' |
| + | ** Engineering, Procurement, Construction, Transportation and Commissioning of the Kaminho Floating Production Storage and Offloading (FPSO) vessel | ||
| + | ** Operation and Maintenance (O&M) of the FPSO for a firm period of 12 years | ||
| + | ** Engineering, Procurement, Supply, Construction, Installation, Pre-Commissioning and Assistance for the commissioning and start-up of a Subsea, Umbilicals, Risers and Flowlines (SURF) package which includes approximately 30 km of 8” and 10" subsea flowlines and risers, and umbilicals | ||
| + | * '''Vallourec:''' | ||
| + | ** Pipes and related services | ||
=== History === | === History === | ||
| − | * | + | * 2019 - Total acquired a stake |
| + | * 2023 - Petronas acquires a 40% stake from Total | ||
| + | * 2024 - FID made for the project | ||
| + | * 2024 - Saipem awarded major contracts | ||
=== Geology === | === Geology === | ||
| Line 22: | Line 32: | ||
=== Links === | === Links === | ||
| − | # | + | # [https://abarrelfull.blogspot.com/2024/05/angola-total-acquires-interests-into.html Angola: Total Acquires Interests into Two New Offshore Licenses in View of Developing a New Production Hub] |
| − | + | # [https://abarrelfull.blogspot.com/2024/05/angola-totalenergies-sells-40-interest.html Angola: TotalEnergies sells a 40% interest in Block 20 to Petronas ahead of its development] | |
| + | # [https://a-barrel-full.blogspot.com/2024/05/angola-totalenergies-launches-kaminho.html Angola: TotalEnergies launches the Kaminho deepwater project] | ||
| + | # [https://a-barrel-full.blogspot.com/2024/05/saipem-three-new-contracts-awarded-by.html Saipem: three new contracts awarded by TotalEnergies E&P Angola Block 20 for the Kaminho project for an overall amount of 3.7 billion USD] | ||
| + | # [https://a-barrel-full.blogspot.com/2024/07/vallourec-wins-major-order-from.html Vallourec wins a major order from TotalEnergies in Angola] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Angola]] | [[category:Angola]] | ||
[[category:Total]] | [[category:Total]] | ||
Latest revision as of 15:45, 11 July 2024
Summary Information
- Operator: Total
- Country: Angola
- Location: Kwanza basin, offshore
- Production start: expected 2028
- Partners: TotalEnergies (40%), Petronas (40%) and Sonangol (20%)
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: Target is 70,000 bpd
Description
- The development which is known as the Kaminho project is the first large deepwater development in the Kwanza basin
- It comprises the conversion of a Very Large Crude Carrier (VLCC) to a Floating Production Storage and Offloading, The Kaminho FPSO, which will be connected to a subsea production network.
- Designed to minimize greenhouse gas emissions and eliminate routine flaring, this FPSO is all-electric and associated gas will be fully reinjected into the reservoirs. * Production start-up is expected in 2028, with a plateau of 70,000 barrels of oil per day.
Contractors
- Saipem:
- Engineering, Procurement, Construction, Transportation and Commissioning of the Kaminho Floating Production Storage and Offloading (FPSO) vessel
- Operation and Maintenance (O&M) of the FPSO for a firm period of 12 years
- Engineering, Procurement, Supply, Construction, Installation, Pre-Commissioning and Assistance for the commissioning and start-up of a Subsea, Umbilicals, Risers and Flowlines (SURF) package which includes approximately 30 km of 8” and 10" subsea flowlines and risers, and umbilicals
- Vallourec:
- Pipes and related services
History
- 2019 - Total acquired a stake
- 2023 - Petronas acquires a 40% stake from Total
- 2024 - FID made for the project
- 2024 - Saipem awarded major contracts
Geology
Links
- Angola: Total Acquires Interests into Two New Offshore Licenses in View of Developing a New Production Hub
- Angola: TotalEnergies sells a 40% interest in Block 20 to Petronas ahead of its development
- Angola: TotalEnergies launches the Kaminho deepwater project
- Saipem: three new contracts awarded by TotalEnergies E&P Angola Block 20 for the Kaminho project for an overall amount of 3.7 billion USD
- Vallourec wins a major order from TotalEnergies in Angola