Difference between revisions of "Lincolnshire Offshore Gas Gathering System (Loggs)"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "Summary Information  * Source: Southern North Sea * Destination: Theddlethorpe Gas Processing Plant * Ownership: Conocophillips * Website:   * Length:  kilometres ( miles)...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| (3 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information  | + | === Summary Information ===  | 
* Source: Southern North Sea  | * Source: Southern North Sea  | ||
| Line 9: | Line 9: | ||
* Status: Operating  | * Status: Operating  | ||
| − | + | === Details ===  | |
| − | *   | + | * The Lincolnshire Offshore Gas Gathering System (LOGGS) development consists of a single ‘gas gathering’ complex which collected gas from a total of 16 ‘satellite’ platforms and 6 subsea centres up to ~55km from the main LOGGS installation.  | 
| + | * The LOGGS Installation comprises of the following 5 jackets which are linked together by fixed bridges:  | ||
| + | ** PR (Riser Platform);  | ||
| + | ** PC (Compression Platform);  | ||
| + | ** PP (Production Platform);  | ||
| + | ** PA (Accommodation Platform);  | ||
| + | ** PD (North Valiant 1 Wellhead Platform).  | ||
| + | * Only the Riser platform is unmanned  | ||
* The system gathers gas from a large number of fields in the Southern North Sea and transports it to the [[Theddlethorpe Gas Processing Plant]]  | * The system gathers gas from a large number of fields in the Southern North Sea and transports it to the [[Theddlethorpe Gas Processing Plant]]  | ||
| − | + | === Contractors ===  | |
| − | *   | + | * '''Seaway Heavy Lifting:''' LOGGS Riser Platform  | 
| − | + | ==== Related Gas Fields ===  | |
* The facility receives natural gas from the V-fields;  | * The facility receives natural gas from the V-fields;  | ||
| − | ** [[Vampire, Viscount   | + | ** [[Vampire, Viscount and Valkyrie Gas Fields]];   | 
| − | * The [[Saturn Area Gas Fields]], [[Mimas   | + | ** [[Valiant, Vanguard and Vulcan Gas Fields]];  | 
| + | * The [[Saturn Area Gas Fields]], [[Mimas and Tethys Gas Fields]]:    | ||
** Saturn, Mimas and Tethys;    | ** Saturn, Mimas and Tethys;    | ||
* The [[Jupiter Gas Field | Jupiter Area natural gas fields]]:    | * The [[Jupiter Gas Field | Jupiter Area natural gas fields]]:    | ||
| Line 26: | Line 34: | ||
** [[Audrey Gas Field | Ann, Alison, Annabel, Audrey]], [[Anglia Gas Field | Anglia]], Viking, [[Victor Gas Field | Victor]], Vixen and Victoria  | ** [[Audrey Gas Field | Ann, Alison, Annabel, Audrey]], [[Anglia Gas Field | Anglia]], Viking, [[Victor Gas Field | Victor]], Vixen and Victoria  | ||
| − | + | === History ===  | |
* 1988 - Pipeline operations begin    | * 1988 - Pipeline operations begin    | ||
| + | * 1993 - Riser platform installed  | ||
| + | * 2019 - Chrysaor acquired Conocophillips's stake in the pipeline  | ||
| + | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy  | ||
| − | + | === Other Information ===  | |
* HSM Offshore built the Accommodation Platform  | * HSM Offshore built the Accommodation Platform  | ||
| − | + | === Links ===  | |
# [https://www.og.decc.gov.uk/web_files/ems/2012/ConocoPhillips-ems.pdf Conocophillips, UK Upstream Environmental Statement 2011]  | # [https://www.og.decc.gov.uk/web_files/ems/2012/ConocoPhillips-ems.pdf Conocophillips, UK Upstream Environmental Statement 2011]  | ||
# [[List Of Oil and Gas Production Platforms In The UK]]  | # [[List Of Oil and Gas Production Platforms In The UK]]  | ||
# [[HSM Offshore Platform References]]  | # [[HSM Offshore Platform References]]  | ||
# [[FoundOcean Europe Subsea References]]  | # [[FoundOcean Europe Subsea References]]  | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/conocophillips-completes-27-billion.html ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries]  | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading]  | ||
| + | |||
| + | [[category:Pipeline]]  | ||
| + | [[category:UK]]  | ||
| + | [[category:Harbour Energy]]  | ||
Latest revision as of 12:32, 29 June 2024
Contents
Summary Information
- Source: Southern North Sea
 - Destination: Theddlethorpe Gas Processing Plant
 - Ownership: Conocophillips
 - Website:
 - Length: kilometres ( miles)
 - Capacity: per day
 - Status: Operating
 
Details
- The Lincolnshire Offshore Gas Gathering System (LOGGS) development consists of a single ‘gas gathering’ complex which collected gas from a total of 16 ‘satellite’ platforms and 6 subsea centres up to ~55km from the main LOGGS installation.
 - The LOGGS Installation comprises of the following 5 jackets which are linked together by fixed bridges:
- PR (Riser Platform);
 - PC (Compression Platform);
 - PP (Production Platform);
 - PA (Accommodation Platform);
 - PD (North Valiant 1 Wellhead Platform).
 
 - Only the Riser platform is unmanned
 - The system gathers gas from a large number of fields in the Southern North Sea and transports it to the Theddlethorpe Gas Processing Plant
 
Contractors
- Seaway Heavy Lifting: LOGGS Riser Platform
 
= Related Gas Fields
- The facility receives natural gas from the V-fields;
 - The Saturn Area Gas Fields, Mimas and Tethys Gas Fields:
- Saturn, Mimas and Tethys;
 
 - The  Jupiter Area natural gas fields:
- Ganymede, Sinope, Callisto, Europa and NW Bell;
 
 - As well as the third-party fields:
- Ann, Alison, Annabel, Audrey, Anglia, Viking, Victor, Vixen and Victoria
 
 
History
- 1988 - Pipeline operations begin
 - 1993 - Riser platform installed
 - 2019 - Chrysaor acquired Conocophillips's stake in the pipeline
 - 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
 
Other Information
- HSM Offshore built the Accommodation Platform