* On the UK side was an accommodation platform (QP) for 120 people, a treatment platform (TCP2) and a drilling platform( CDP1), while the Norwegian side had a drilling platform (DP2)and a treatment platform (TP1).  
 
* On the UK side was an accommodation platform (QP) for 120 people, a treatment platform (TCP2) and a drilling platform( CDP1), while the Norwegian side had a drilling platform (DP2)and a treatment platform (TP1).  
 
* Bridges connected three of the platforms
 
* Bridges connected three of the platforms
* Gas was transported to the [[[St Fergus Gas Processing Plants]]], via the [[[Frigg UK Gas Pipeline System]]]
+
* Gas was transported to the [[St Fergus Gas Processing Plants]], via the [[Frigg UK Gas Pipeline System]]
* Oil was transported on the Frostpipe Crude Oil Pipeline to the [[[Oseberg Oil Field]]]
+
* Oil was transported on the Frostpipe Crude Oil Pipeline to the [[Oseberg Oil Field]]
  
 
=== Contractors ===
 
=== Contractors ===
Line 34: Line 34:
 
* 1977 - Project development approved by UK Government
 
* 1977 - Project development approved by UK Government
 
* 1977 - First gas produced
 
* 1977 - First gas produced
 +
* 2003 - Approval granted for decommissioning
 
* 2004 - Saipem  awarded the contract for the offshore removal and transport of seven large platforms
 
* 2004 - Saipem  awarded the contract for the offshore removal and transport of seven large platforms
  
Line 42: Line 43:
 
# [http://www.npd.no/en/Publications/Facts/Facts-2013/Chapter-13/ NPD, Fields where production has ceased]
 
# [http://www.npd.no/en/Publications/Facts/Facts-2013/Chapter-13/ NPD, Fields where production has ceased]
 
# [https://www.abdn.ac.uk/historic/friggexhibition/ University of Aberdeen]
 
# [https://www.abdn.ac.uk/historic/friggexhibition/ University of Aberdeen]
 +
# [[UK Oil and Gas Field Approved Decommissioning Programmes]]
 
# [[Seaway Heavy Lifting Oil And Gas References]]
 
# [[Seaway Heavy Lifting Oil And Gas References]]
 
# [[Emtunga Europe Offshore Platform References]]
 
# [[Emtunga Europe Offshore Platform References]]
Line 47: Line 49:
 
# [[[Kvaerner Topsides References]]
 
# [[[Kvaerner Topsides References]]
 
# [http://killajoules.wikidot.com/archive:awarded-to-saipem-a-decommissioning-contract-in-nort Awarded to Saipem a decommissioning contract in North Sea amounting to approximately 130 million Euro]
 
# [http://killajoules.wikidot.com/archive:awarded-to-saipem-a-decommissioning-contract-in-nort Awarded to Saipem a decommissioning contract in North Sea amounting to approximately 130 million Euro]
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:Total]]

Revision as of 12:07, 28 June 2024

Summary Information

  • Operator: Total
  • Country: Norway / UK
  • Location: North Sea
  • Production start: 1977
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Frigg Field was the world's largest and deepest offshore gas field when discovered in 1971
  • It straddled both the Norwegian and British sectors of the North Sea
  • There were two platforms on the Norwegian side and three on the British side of the border.
  • On the UK side was an accommodation platform (QP) for 120 people, a treatment platform (TCP2) and a drilling platform( CDP1), while the Norwegian side had a drilling platform (DP2)and a treatment platform (TP1).
  • Bridges connected three of the platforms
  • Gas was transported to the St Fergus Gas Processing Plants, via the Frigg UK Gas Pipeline System
  • Oil was transported on the Frostpipe Crude Oil Pipeline to the Oseberg Oil Field

Contractors

  • **EAN:** Frigg DP2 & Frigg QP
  • **Stolt Offshore:** Frostpipe riser supports
  • **Heerema Marine Contractors:** NE Frigg Template
  • **Kvaerner:** 2 Modules for TCP2
  • **Emtunga:**
    • HVAC module
    • DP 2 - Battery room module, Technical & office modules
    • TP 1 - Calibration shop module & Office module
  • **Seaway Heavy Lifting:** T & I of Three templates on Lille Frigg
  • **Saipem:** Offshore removal and transport of seven large platforms

History

  • 1971 - Frigg Gas Field discovered
  • 1977 - Project development approved by UK Government
  • 1977 - First gas produced
  • 2003 - Approval granted for decommissioning
  • 2004 - Saipem awarded the contract for the offshore removal and transport of seven large platforms

Geology

Links

  1. NPD, Fields where production has ceased
  2. University of Aberdeen
  3. UK Oil and Gas Field Approved Decommissioning Programmes
  4. Seaway Heavy Lifting Oil And Gas References
  5. Emtunga Europe Offshore Platform References
  6. FoundOcean Subsea References
  7. [[[Kvaerner Topsides References]]