Difference between revisions of "Brenda Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Operator: Premier Oil | * Operator: Premier Oil | ||
* Country: UK | * Country: UK | ||
| Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
| − | + | === Description === | |
* The Brenda Field is located approximately 225km to the northeast of Aberdeen in UKCS Block 15/25b, where the water depth is approximately 150m at LAT. | * The Brenda Field is located approximately 225km to the northeast of Aberdeen in UKCS Block 15/25b, where the water depth is approximately 150m at LAT. | ||
* Brenda lies approximately 8.5km to the southwest of the [[Balmoral Oil Field | Balmoral FPV]] to which the field is tied back | * Brenda lies approximately 8.5km to the southwest of the [[Balmoral Oil Field | Balmoral FPV]] to which the field is tied back | ||
| − | + | === Contractors === | |
| − | * | + | * '''Technip:''' Project management and installation of an 8.7km production pipeline piggybacked with a gas lift pipeline |
| − | + | === History === | |
* 2005 - Project development approved by UK Government | * 2005 - Project development approved by UK Government | ||
* 2007 - First oil produced | * 2007 - First oil produced | ||
* 2009 - Premier Oil acquires the field in Oilexpro deal | * 2009 - Premier Oil acquires the field in Oilexpro deal | ||
| + | * 2018 - Oil production ceased | ||
| + | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy | ||
| + | * 2021 - Approval granted for decommissioning | ||
| − | + | === Geology === | |
* | * | ||
| − | + | === Links === | |
# [http://killajoules.wikidot.com/archive:technip-annouces-two-contract-awards-for-the-brenda Technip annouces two contract awards for the Brenda and Affleck developments in UK North Sea] | # [http://killajoules.wikidot.com/archive:technip-annouces-two-contract-awards-for-the-brenda Technip annouces two contract awards for the Brenda and Affleck developments in UK North Sea] | ||
# [http://killajoules.wikidot.com/archive:premier-oil-acquisition-and-rights-issue Premier Oil Acquisition and Rights Issue] | # [http://killajoules.wikidot.com/archive:premier-oil-acquisition-and-rights-issue Premier Oil Acquisition and Rights Issue] | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading] | ||
| + | |||
| + | [[category:Field]] | ||
| + | [[category:UK]] | ||
| + | [[category:Harbour Energy]] | ||
| + | [[category:Decommissioned]] | ||
Revision as of 15:38, 11 June 2024
Summary Information
- Operator: Premier Oil
- Country: UK
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Brenda Field is located approximately 225km to the northeast of Aberdeen in UKCS Block 15/25b, where the water depth is approximately 150m at LAT.
- Brenda lies approximately 8.5km to the southwest of the Balmoral FPV to which the field is tied back
Contractors
- Technip: Project management and installation of an 8.7km production pipeline piggybacked with a gas lift pipeline
History
- 2005 - Project development approved by UK Government
- 2007 - First oil produced
- 2009 - Premier Oil acquires the field in Oilexpro deal
- 2018 - Oil production ceased
- 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
- 2021 - Approval granted for decommissioning