Difference between revisions of "Grove Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Centrica * Country: UK * Location: 49/10a, Southern North Sea * Production start: 2007 * Partners: * Type: Gas * Estimated Reserves: * Produ...") |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
| − | * Operator: | + | * Operator: Spirit Energy |
* Country: UK | * Country: UK | ||
* Location: 49/10a, Southern North Sea | * Location: 49/10a, Southern North Sea | ||
| Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
| − | + | === Description === | |
* The Grove Field development is situated in Block 49/10a in the southern North Sea (SNS) approximately 133 kilometres to the East of Great Yarmouth and 6 kilometres West of the UK/Dutch meridian line. | * The Grove Field development is situated in Block 49/10a in the southern North Sea (SNS) approximately 133 kilometres to the East of Great Yarmouth and 6 kilometres West of the UK/Dutch meridian line. | ||
* The NUI platform structure re-used the decommissioned [[Camelot Gas Fields | Camelot CB platform]] | * The NUI platform structure re-used the decommissioned [[Camelot Gas Fields | Camelot CB platform]] | ||
* The field is tied back to the [[Markham Gas Field]] | * The field is tied back to the [[Markham Gas Field]] | ||
| − | + | === Contractors === | |
| − | * | + | * '''Seaway Heavy Lifting:''' T & I - Grove Wellhead Platform |
| − | * | + | * '''Subsea 7:''' Grove Extension |
| − | + | ** project management, engineering, procurement, fabrication, installation and pre-commissioning of pipelines service umbilicals and piled structures, | |
| − | + | ** all associated subsea installation and construction work including trenching and protection of the pipeline and umbilical systems | |
| − | * | + | * '''KWsubsea:''' 10" (13.3km) Pipeline |
| − | + | === History === | |
* 1971 - Grove Gas Field discovered | * 1971 - Grove Gas Field discovered | ||
* 2005 - Initial wells drilled | * 2005 - Initial wells drilled | ||
* 2006 - UK government approval for development | * 2006 - UK government approval for development | ||
* 2007 - First gas produced | * 2007 - First gas produced | ||
| + | * 2021 - More gas discovered at Grove North East | ||
| − | + | === Geology === | |
* Leman and Barren Red Measures Sands | * Leman and Barren Red Measures Sands | ||
| − | + | === Links === | |
# [https://itportal.decc.gov.uk/environment/permits/NewfieldGrove.htm Newfield Petroleum UK Ltd Grove Development] | # [https://itportal.decc.gov.uk/environment/permits/NewfieldGrove.htm Newfield Petroleum UK Ltd Grove Development] | ||
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
| Line 38: | Line 39: | ||
# [http://killajoules.wikidot.com/archive:newfield-announces-exploration-discoveries Newfield Announces Exploration Discoveries] | # [http://killajoules.wikidot.com/archive:newfield-announces-exploration-discoveries Newfield Announces Exploration Discoveries] | ||
# [http://killajoules.wikidot.com/archive:centrica-invests-to-acquire-north-sea-gas-assets Centrica invests to acquire North Sea gas assets] | # [http://killajoules.wikidot.com/archive:centrica-invests-to-acquire-north-sea-gas-assets Centrica invests to acquire North Sea gas assets] | ||
| + | # [https://abarrelfull.blogspot.com/2024/06/spirit-energy-finds-more-gas-at-grove.html Spirit Energy Finds More Gas at Grove Field] | ||
| + | |||
| + | [[category:Field]] | ||
| + | [[category:UK]] | ||
| + | [[category:Spirit Energy]] | ||
Revision as of 14:11, 3 June 2024
Summary Information
- Operator: Spirit Energy
- Country: UK
- Location: 49/10a, Southern North Sea
- Production start: 2007
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Grove Field development is situated in Block 49/10a in the southern North Sea (SNS) approximately 133 kilometres to the East of Great Yarmouth and 6 kilometres West of the UK/Dutch meridian line.
- The NUI platform structure re-used the decommissioned Camelot CB platform
- The field is tied back to the Markham Gas Field
Contractors
- Seaway Heavy Lifting: T & I - Grove Wellhead Platform
- Subsea 7: Grove Extension
- project management, engineering, procurement, fabrication, installation and pre-commissioning of pipelines service umbilicals and piled structures,
- all associated subsea installation and construction work including trenching and protection of the pipeline and umbilical systems
- KWsubsea: 10" (13.3km) Pipeline
History
- 1971 - Grove Gas Field discovered
- 2005 - Initial wells drilled
- 2006 - UK government approval for development
- 2007 - First gas produced
- 2021 - More gas discovered at Grove North East
Geology
- Leman and Barren Red Measures Sands
Links
- Newfield Petroleum UK Ltd Grove Development
- UK Oil and Gas Fields by Approval Date
- List Of Oil Production Platforms In The UK
- Seaway Heavy Lifting Oil And Gas References
- KWsubsea Upheaval Buckling And Out Of Straightness Analysis
- Newfield Announces Exploration Discoveries
- Centrica invests to acquire North Sea gas assets
- Spirit Energy Finds More Gas at Grove Field