Summary Information
+
=== Summary Information ===
 
* Operator: Ithaca
 
* Operator: Ithaca
 
* Country: UK  
 
* Country: UK  
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 +
* * The field has ceased production
 
* The Causeway Field is being developed together with the **Fionn Field,** using subsea production technology with a tie-back to the existing North Cormorant Platform, via the [[Dunlin Oil Field]].  
 
* The Causeway Field is being developed together with the **Fionn Field,** using subsea production technology with a tie-back to the existing North Cormorant Platform, via the [[Dunlin Oil Field]].  
 
* The Fionn field development consists of one production well that is tied back approximately 3km to the Causeway pipeline to North Cormorant
 
* The Fionn field development consists of one production well that is tied back approximately 3km to the Causeway pipeline to North Cormorant
 
* The reservoir development strategy is to maintain production with the use of electrical submersible pumps (ESPs) and water injection. The Causeway Field will comprise one oil-producing well, one contingent oil-producing well and one water-injection well.
 
* The reservoir development strategy is to maintain production with the use of electrical submersible pumps (ESPs) and water injection. The Causeway Field will comprise one oil-producing well, one contingent oil-producing well and one water-injection well.
  
+++ Contractors
+
=== Contractors ===
 
* **Technip:** Engineering, procurement, installation and commissioning of rigid and flexible pipelines, subsea equipment as well as umbilicals  
 
* **Technip:** Engineering, procurement, installation and commissioning of rigid and flexible pipelines, subsea equipment as well as umbilicals  
 
* GE: Supply of two subsea production trees, one subsea water injection tree system, rental tooling and installation services
 
* GE: Supply of two subsea production trees, one subsea water injection tree system, rental tooling and installation services
  
+++ History
+
=== History ===
 
* 1992 - The Causeway field was discovered
 
* 1992 - The Causeway field was discovered
 
* 2008 - Agreement signed with Fairfield to tie back to [[[Dunlin Oil Field]]]
 
* 2008 - Agreement signed with Fairfield to tie back to [[[Dunlin Oil Field]]]
 
* 2011 - UK government approval granted
 
* 2011 - UK government approval granted
 
* 2011 - Technip awarded subsea equipment contract
 
* 2011 - Technip awarded subsea equipment contract
 +
* 2022 - Approval granted for decommissioning
  
+++ Geology
+
=== Geology ===
 
* Causeway and Fionn produce from the Brent sandstone sequence
 
* Causeway and Fionn produce from the Brent sandstone sequence
  
+++ Links
+
=== Links
 +
# [[UK Oil and Gas Field Approved Decommissioning Programmes]]
 
# [http://killajoules.wikidot.com/archive:fairfield-announces-causeway-tie-in-to-dunlin Fairfield Announces Causeway Tie-in to Dunlin]
 
# [http://killajoules.wikidot.com/archive:fairfield-announces-causeway-tie-in-to-dunlin Fairfield Announces Causeway Tie-in to Dunlin]
 
# [http://killajoules.wikidot.com/blog:1457 Technip awarded contract by Valiant for Causeway development]
 
# [http://killajoules.wikidot.com/blog:1457 Technip awarded contract by Valiant for Causeway development]
 
# [http://killajoules.wikidot.com/archive:ge-subsea-technology-tapped-for-fast-paced-causeway GE Subsea Technology Tapped for Fast-Paced Causeway Field Development]
 
# [http://killajoules.wikidot.com/archive:ge-subsea-technology-tapped-for-fast-paced-causeway GE Subsea Technology Tapped for Fast-Paced Causeway Field Development]
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:Ithaca]]
 +
[[category:Decommissioned]]

Revision as of 15:58, 30 May 2024

Summary Information

  • Operator: Ithaca
  • Country: UK
  • Location: 450 kilometers North-east of Aberdeen
  • Production start:
  • Partners:
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

Description

  • * The field has ceased production
  • The Causeway Field is being developed together with the **Fionn Field,** using subsea production technology with a tie-back to the existing North Cormorant Platform, via the Dunlin Oil Field.
  • The Fionn field development consists of one production well that is tied back approximately 3km to the Causeway pipeline to North Cormorant
  • The reservoir development strategy is to maintain production with the use of electrical submersible pumps (ESPs) and water injection. The Causeway Field will comprise one oil-producing well, one contingent oil-producing well and one water-injection well.

Contractors

  • **Technip:** Engineering, procurement, installation and commissioning of rigid and flexible pipelines, subsea equipment as well as umbilicals
  • GE: Supply of two subsea production trees, one subsea water injection tree system, rental tooling and installation services

History

  • 1992 - The Causeway field was discovered
  • 2008 - Agreement signed with Fairfield to tie back to [[[Dunlin Oil Field]]]
  • 2011 - UK government approval granted
  • 2011 - Technip awarded subsea equipment contract
  • 2022 - Approval granted for decommissioning

Geology

  • Causeway and Fionn produce from the Brent sandstone sequence

=== Links

  1. UK Oil and Gas Field Approved Decommissioning Programmes
  2. Fairfield Announces Causeway Tie-in to Dunlin
  3. Technip awarded contract by Valiant for Causeway development
  4. GE Subsea Technology Tapped for Fast-Paced Causeway Field Development