* The field has ceased production
 
* The Heather A platform has been in production since 1978.  
 
* The Heather A platform has been in production since 1978.  
 
* A total of 64 wells have been drilled, the majority initially completed as gas lifted production wells.  A total of 27 wells were subsequently converted to water injection.  
 
* A total of 64 wells have been drilled, the majority initially completed as gas lifted production wells.  A total of 27 wells were subsequently converted to water injection.  
 
* Today there are 15 producing wells and three water injection wells in operation
 
* Today there are 15 producing wells and three water injection wells in operation
* The [[[Broom Oil Field]]] is a tie back to the Heather Platform
+
* The [[Broom Oil Field]] is a tie back to the Heather Platform
* Oil is transported by the [[[Ninian Crude Oil Pipeline]]] to the [[[Sullom Voe Oil Terminal]]]
+
* Oil is transported by the [[Ninian Crude Oil Pipeline]] to the [[Sullom Voe Oil Terminal]]
  
 
=== Contractors ===
 
=== Contractors ===
Line 36: Line 37:
 
# [http://www.enquest.com/our-business/operated-assets/heather-broom.aspx EnQuest, Heather & Broom]
 
# [http://www.enquest.com/our-business/operated-assets/heather-broom.aspx EnQuest, Heather & Broom]
 
# [[List Of Oil Production Platforms In The UK]]
 
# [[List Of Oil Production Platforms In The UK]]
 +
# [[UK Oil and Gas Field Approved Decommissioning Programmes]]
 
# [[FoundOcean Subsea References]]
 
# [[FoundOcean Subsea References]]
 
# [http://killajoules.wikidot.com/archive:formal-approval-of-heather-agreements Formal Approval of Heather Agreements]
 
# [http://killajoules.wikidot.com/archive:formal-approval-of-heather-agreements Formal Approval of Heather Agreements]
Line 41: Line 43:
 
# [http://killajoules.wikidot.com/archive:lundin-petroleum-to-acquire-certain-assets-of-dno-in Lundin Petroleum to Acquire Certain Assets of DNO in UK, Norway and Ireland]
 
# [http://killajoules.wikidot.com/archive:lundin-petroleum-to-acquire-certain-assets-of-dno-in Lundin Petroleum to Acquire Certain Assets of DNO in UK, Norway and Ireland]
 
# [https://a-barrel-full.blogspot.com/2023/04/saipem-awarded-new-offshore-epci.html Saipem: awarded new offshore EPCI contracts and competitive FEED contracts totalling approximately 650 million USD]
 
# [https://a-barrel-full.blogspot.com/2023/04/saipem-awarded-new-offshore-epci.html Saipem: awarded new offshore EPCI contracts and competitive FEED contracts totalling approximately 650 million USD]
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:EnQuest]]

Latest revision as of 14:51, 30 May 2024

Summary Information

  • Operator: EnQuest
  • Country: UK
  • Location: Block 2/5 of the Northern North Sea
  • Production start: 1978
  • Partners: EnQuest 100%
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

Description

  • The field has ceased production
  • The Heather A platform has been in production since 1978.
  • A total of 64 wells have been drilled, the majority initially completed as gas lifted production wells. A total of 27 wells were subsequently converted to water injection.
  • Today there are 15 producing wells and three water injection wells in operation
  • The Broom Oil Field is a tie back to the Heather Platform
  • Oil is transported by the Ninian Crude Oil Pipeline to the Sullom Voe Oil Terminal

Contractors

  • **McDermott:** Construction of Platform
  • **FoundOcean:** Grouting for the platform

Decommissioning

  • Saipem: engineering, preparation, removal and disposal of the upper jacket of the Heather platform

History

  • 1973 - The Heather field was discovered
  • 1978 - Project development approved by UK Government
  • 1978 - First oil produced
  • 1999 - DNO recieved approval from the DTI for field operation
  • 2008 - Lundin acquires DNO's stake in the field
  • 2023 - Saipem awarded decommissioning contract

Geology

  • The field has a Middle Jurassic Brent reservoir

Links

  1. EnQuest, Heather & Broom
  2. List Of Oil Production Platforms In The UK
  3. UK Oil and Gas Field Approved Decommissioning Programmes
  4. FoundOcean Subsea References
  5. Formal Approval of Heather Agreements
  6. Heather Field doubles production
  7. Lundin Petroleum to Acquire Certain Assets of DNO in UK, Norway and Ireland
  8. Saipem: awarded new offshore EPCI contracts and competitive FEED contracts totalling approximately 650 million USD