Difference between revisions of "Kelvin Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 10: | Line 10: | ||
=== Description === | === Description === | ||
| − | * The Kelvin field development consists of a single well, a minimum-facilities platform and a 12 kilometre pipeline that connects to the [[Murdoch Gas | + | * The Kelvin field development consists of a single well, a minimum-facilities platform and a 12 kilometre pipeline that connects to the [[Caister Murdoch Gas Fields | Murdoch Complex]] to the [[Theddlethorpe Gas Processing Plant]] via the CMS pipeline system. |
=== Contractors === | === Contractors === | ||
Latest revision as of 14:24, 30 May 2024
Summary Information
- Operator: ConocoPhillips
- Country: UK
- Location: Southern North Sea
- Production start: 2007
- Partners: GDF Suez, Tullow
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Kelvin field development consists of a single well, a minimum-facilities platform and a 12 kilometre pipeline that connects to the Murdoch Complex to the Theddlethorpe Gas Processing Plant via the CMS pipeline system.
Contractors
- Heerema Marine Contractors: Platform Construction
- KWSubsea: Design of Kelvin Pigging Manifold Assembly
- Global Maritime: Warranty surveyor for installation of flowline and subsea manifolds
History
- 2005 - Kelvin Gas Field discovered
- 2007 - Project development approved by UK Government
- 2007 - First gas produced