Difference between revisions of "Cameia and Golfinho Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: * Country: * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: === Descrip...") |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Operator: | + | * Operator: Total |
| − | * Country: | + | * Country: Angola |
| − | * Location: | + | * Location: Kwanza basin, offshore |
| − | * Production start: | + | * Production start: expected 2028 |
* Partners: | * Partners: | ||
* Type: Oil / Gas | * Type: Oil / Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
| − | * Production Volume: | + | * Production Volume: Target is 70,000 bpd |
=== Description === | === Description === | ||
| − | * | + | * The development which is known as the Kaminho project is the first large deepwater development in the Kwanza basin |
| + | * It comprises the conversion of a Very Large Crude Carrier (VLCC) to a Floating Production Storage and Offloading, The [[Kaminho FPSO]], which will be connected to a subsea production network. | ||
| + | * Designed to minimize greenhouse gas emissions and eliminate routine flaring, this FPSO is all-electric and associated gas will be fully reinjected into the reservoirs. * Production start-up is expected in 2028, with a plateau of 70,000 barrels of oil per day. | ||
=== Contractors === | === Contractors === | ||
| Line 16: | Line 18: | ||
=== History === | === History === | ||
| − | * | + | * 2024 - FID made for the project |
=== Geology === | === Geology === | ||
Revision as of 07:02, 22 May 2024
Summary Information
- Operator: Total
- Country: Angola
- Location: Kwanza basin, offshore
- Production start: expected 2028
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: Target is 70,000 bpd
Description
- The development which is known as the Kaminho project is the first large deepwater development in the Kwanza basin
- It comprises the conversion of a Very Large Crude Carrier (VLCC) to a Floating Production Storage and Offloading, The Kaminho FPSO, which will be connected to a subsea production network.
- Designed to minimize greenhouse gas emissions and eliminate routine flaring, this FPSO is all-electric and associated gas will be fully reinjected into the reservoirs. * Production start-up is expected in 2028, with a plateau of 70,000 barrels of oil per day.
Contractors
- -
History
- 2024 - FID made for the project