·Commissioning & trial operation  | ·Commissioning & trial operation  | ||
| − | # [[Liwan 3 1 Gas Field]]    | + | # [[Liwan 3-1 Gas Field]]    | 
#* China  | #* China  | ||
#* South Sea of China  | #* South Sea of China  | ||
| Line 19: | Line 19: | ||
#* Liwan 3-1 MEG Module  | #* Liwan 3-1 MEG Module  | ||
#* Engineering, Onshore construction, Vessels Installation, Electrical Equipment Installation & Wiring Connection& Project management  | #* Engineering, Onshore construction, Vessels Installation, Electrical Equipment Installation & Wiring Connection& Project management  | ||
| − | # [[P 58 FPSO]]  | + | # [[P-58 FPSO]]  | 
#* Brazil  | #* Brazil  | ||
#* [[Parque Das Baleias Oil Field]]  | #* [[Parque Das Baleias Oil Field]]  | ||
| Line 25: | Line 25: | ||
#* Piping prefabrication for the FPSO P58  | #* Piping prefabrication for the FPSO P58  | ||
#* Engineering ·Procurement ·Onshore construction ·Project management ·Load-out  | #* Engineering ·Procurement ·Onshore construction ·Project management ·Load-out  | ||
| − | # [[Cidade   | + | # [[Cidade de São Paulo MV23 FPSO]]  | 
#* Brazil  | #* Brazil  | ||
| − | #* [[Sapinhoa Guara Oil Field]]  | + | #* [[Sapinhoa-Guara Oil Field]]  | 
#* Petrobras  | #* Petrobras  | ||
#* Pancake Modules  | #* Pancake Modules  | ||
#* Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.  | #* Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.  | ||
| − | # [[P 63 FPSO]]  | + | # [[P-63 FPSO]]  | 
#* Brazil  | #* Brazil  | ||
#* [[Papa Terra Oil Field]]  | #* [[Papa Terra Oil Field]]  | ||
| Line 37: | Line 37: | ||
#* Heating & Cooling Module (M82)  | #* Heating & Cooling Module (M82)  | ||
#* Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.  | #* Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.  | ||
| − | # [[P 63 FPSO]]  | + | # [[P-63 FPSO]]  | 
#* Brazil  | #* Brazil  | ||
#* [[Papa Terra Oil Field]]  | #* [[Papa Terra Oil Field]]  | ||
| Line 43: | Line 43: | ||
#* Project Utilities Module (M81)  | #* Project Utilities Module (M81)  | ||
#* Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.  | #* Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.  | ||
| − | # [[Cidade   | + | # [[Cidade de São Paulo MV23 FPSO]]  | 
#* Brazil  | #* Brazil  | ||
| − | #* [[Sapinhoa Guara Oil Field]] - Brazil  | + | #* [[Sapinhoa-Guara Oil Field]] - Brazil  | 
#* Petrobras  | #* Petrobras  | ||
#* MV23 SRU Module, Size (L×W×H): 34,3mm×19,23mm, Weight: 650 tons, Main Material: Carbon Steel  | #* MV23 SRU Module, Size (L×W×H): 34,3mm×19,23mm, Weight: 650 tons, Main Material: Carbon Steel  | ||
#* Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management  | #* Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management  | ||
| − | # [[Cidade   | + | # [[Cidade de São Paulo MV23 FPSO]]  | 
#* Brazil  | #* Brazil  | ||
| − | #* [[Sapinhoa Guara Oil Field]] - Brazil  | + | #* [[Sapinhoa-Guara Oil Field]] - Brazil  | 
#* Petrobras  | #* Petrobras  | ||
#* MV23 Chemical Injection Module - Size (L×W×H): 17m×23.5m×12m, Weight: 362 tons, Main Material: Carbon Steel  | #* MV23 Chemical Injection Module - Size (L×W×H): 17m×23.5m×12m, Weight: 362 tons, Main Material: Carbon Steel  | ||
#* Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management  | #* Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management  | ||
| − | # [[Cidade   | + | # [[Cidade de São Paulo MV23 FPSO]]  | 
#* Brazil  | #* Brazil  | ||
| − | #* [[Sapinhoa Guara Oil Field]] - Brazil  | + | #* [[Sapinhoa-Guara Oil Field]] - Brazil  | 
#* Petrobras  | #* Petrobras  | ||
#* MV23 Gas Turbine Generator Module - Size (L×W×H): 24.3m×25.5m×14m, Weight: 497 tons, Main Material: Carbon Steel  | #* MV23 Gas Turbine Generator Module - Size (L×W×H): 24.3m×25.5m×14m, Weight: 497 tons, Main Material: Carbon Steel  | ||
#* Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management  | #* Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management  | ||
| − | # [[Cidade   | + | # [[Cidade de Angra dos Reis MV22 FPSO]]  | 
#* Brazil  | #* Brazil  | ||
#* [[Lula Oil Field]]  | #* [[Lula Oil Field]]  | ||
| Line 151: | Line 151: | ||
#* Description:·6 Floors ﹢ Helideck, Size (L×W×H): 62m×35m×26m, Weight: 2003 tons, Accommodation: 100 persons, Main Material: Carbon Steel  | #* Description:·6 Floors ﹢ Helideck, Size (L×W×H): 62m×35m×26m, Weight: 2003 tons, Accommodation: 100 persons, Main Material: Carbon Steel  | ||
#* Scope of Work:Detail design, Fabrication design, Engineering, Procurement, Onshore, Construction & pre-commissioning, Load-out, Part of offshore hook- up & commissioning  | #* Scope of Work:Detail design, Fabrication design, Engineering, Procurement, Onshore, Construction & pre-commissioning, Load-out, Part of offshore hook- up & commissioning  | ||
| − | + | # Pemex Mexico Bay Two LQ Client:China Oilfield Service Limited (COSL) Location:Gulf of Mexico    | |
| − | Client:China Oilfield Service Limited (COSL)  | + | #* Description:  | 
| − | Location:Gulf of Mexico  | + | #** 2 Living Quarters  | 
| − | Description:  | + | #** 4 Floors ﹢ Helideck  | 
| − | + | #** Size: 35 m×14 m  | |
| − | + | #** Weight: 672 tons (for Each)  | |
| − | + | #** Accommodation: 80 persons  | |
| − | + | #** Main Material: Carbon Steel  | |
| − | + | #* Scope of Work:  | |
| − | + | #** Fabrication Design, Procurement, Onshore Construction, Inspection, Pre-commissioning, Load-out, Overall Project Management & Control  | |
| − | Scope of Work:  | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
# [[Penglai 19-3 Oil Field]]    | # [[Penglai 19-3 Oil Field]]    | ||
#* Bohai Bay Phase II WHPC LQ  | #* Bohai Bay Phase II WHPC LQ  | ||
| Line 188: | Line 179: | ||
#* CNOOC  | #* CNOOC  | ||
#* Two LQ Modules - 3 Floors ﹢ Helideck  | #* Two LQ Modules - 3 Floors ﹢ Helideck  | ||
| − | + | #** QK18-1/LQ: Size (L×W×H): 23m×10m×10m, Weight: 610 tons, Accommodation: 54 persons  | |
| − | + | #** QK17-3/LQ: Size: 21m×10m×10m, Weight: 570 tons, Accommodation: 47 persons  | |
#* Scope of Work:Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Sea-fastening, Offshore hook-up & commissioning  | #* Scope of Work:Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Sea-fastening, Offshore hook-up & commissioning  | ||
# [[Qikou 17-2 Oil Field]]  | # [[Qikou 17-2 Oil Field]]  | ||
| Line 212: | Line 203: | ||
#* Location:Bohai Bay, P.R. China  | #* Location:Bohai Bay, P.R. China  | ||
#* Description:  | #* Description:  | ||
| − | + | #** Size (L×W×H): 15m×12.5m×10m  | |
| − | + | #** Weight Limitation: 139 tons  | |
| − | + | #** Final Weighing: 127 tons  | |
| − | + | #** Accommodation: 50 persons  | |
| − | + | #** Main Material: 316LS.S. & Aluminum  | |
#* Scope of Work:  | #* Scope of Work:  | ||
| − | + | #** Fabrication design  | |
| − | + | #** Engineering  | |
| − | + | #** Procurement  | |
| − | + | #** Onshore construction  | |
| − | + | #** Offshore commissioning  | |
+++ Links  | +++ Links  | ||
Latest revision as of 09:34, 15 May 2024
Oil & Gas Processing Topside Module
■ Topside Modules, Living Quarters, Flare Tower & Bridge on 3 Artificial Islands Client:CITIC Oil Location:Offshore Bohai Bay, P.R. China Description: ·Facilities Construction for 3 Artificial Islands·Main Scope of Work:: ·Detail design (excluding process design) ·Procurement ·Construction & installation ·Mechanical completion ·Commissioning & trial operation
- Liwan 3-1 Gas Field
- China
 - South Sea of China
 - Husky/Cameron
 - Liwan 3-1 MEG Module
 - Engineering, Onshore construction, Vessels Installation, Electrical Equipment Installation & Wiring Connection& Project management
 
 - P-58 FPSO
- Brazil
 - Parque Das Baleias Oil Field
 - QUIP
 - Piping prefabrication for the FPSO P58
 - Engineering ·Procurement ·Onshore construction ·Project management ·Load-out
 
 - Cidade de São Paulo MV23 FPSO
- Brazil
 - Sapinhoa-Guara Oil Field
 - Petrobras
 - Pancake Modules
 - Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.
 
 - P-63 FPSO
- Brazil
 - Papa Terra Oil Field
 - Petrobras
 - Heating & Cooling Module (M82)
 - Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.
 
 - P-63 FPSO
- Brazil
 - Papa Terra Oil Field
 - Petrobras
 - Project Utilities Module (M81)
 - Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.
 
 - Cidade de São Paulo MV23 FPSO
- Brazil
 - Sapinhoa-Guara Oil Field - Brazil
 - Petrobras
 - MV23 SRU Module, Size (L×W×H): 34,3mm×19,23mm, Weight: 650 tons, Main Material: Carbon Steel
 - Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management
 
 - Cidade de São Paulo MV23 FPSO
- Brazil
 - Sapinhoa-Guara Oil Field - Brazil
 - Petrobras
 - MV23 Chemical Injection Module - Size (L×W×H): 17m×23.5m×12m, Weight: 362 tons, Main Material: Carbon Steel
 - Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management
 
 - Cidade de São Paulo MV23 FPSO
- Brazil
 - Sapinhoa-Guara Oil Field - Brazil
 - Petrobras
 - MV23 Gas Turbine Generator Module - Size (L×W×H): 24.3m×25.5m×14m, Weight: 497 tons, Main Material: Carbon Steel
 - Scope of Work: Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management
 
 - Cidade de Angra dos Reis MV22 FPSO
- Brazil
 - Lula Oil Field
 - PETROBRAS/MODEC/Aker
 - Seawater Treatment Module
 - Size (L×W): 26m×20m, 600 tons, Main Material: Carbon Steel, Stainless Steel, Duplex & Super Duplex
 - ·Engineering (excluding process design), Procurement, Onshore construction & pre-commissioning, Load-out
 
 - Dynamic Producer FPSO
- Brazil
 - PETROBRAS/Prosafe/Petreco
 - Crude Oil Separator Module
 - 2 Pressure Vessel Modules (Separation, Stabilization & Produced Water Treatment Module), 3 Floors - Size (L×W×H): 18.92m×18.02m×19.925m, Weight: 1152 tons, Main Material: Carbon Steel
 - Scope of Work: Engineering (excluding process design), Procurement, Construction, Project management
 
 - Cidade De Sao Mateus FPSO
- M10 & M62 Modules
 - Client:PETROBRAS/Prosafe/Petreco
 - Location:Offshore Brazil, South America
 - Description:
- M10 & M62 Separator & Water Treatment Modules
 - M10: Size (L×W×H): 27m×19m×19m, Weight: 780 tons, Main Material: Carbon Steel,
 - M62: Size (L×W×H): 25m×18m×20m, Weight: 800 tons, Main Material: Carbon Steel
 - Scope of Work::Engineering (excluding process design), Procurement ·Onshore construction, Pre-commissioning, Load-out, Project management, etc.
 
 
 - Cidade De Niteroi MV18 FPSO
- MEG Module
 - Client:PETROBRAS/MODEC/Petreco
 - Location:Offshore Brazil, South America
 - Description:MEG Reclamation Treatment Module, Size (L×W×H): 14m×8m×16.3m, Total Weight: 310 tons, Main Material: Carbon Steel
 - Scope of Work: Engineering(excluding process design), Procurement, Onshore construction, Pre-commissioning, Load-out, Project management,etc.
 
 
+++ Living Quarters Modules
- Suizhong 36-1 Oil Field
- SZ 36-1 Living Quarters 100POB & 30 POB
 - Client:CNOOC
 - Location:Bohai Bay, P.R. China
 - Description:
 - 100 POB, Size (L×W×H): 33m X 12m X 19.5m, Total Weight: 1246 tons, Main Material: Carbon Steel,
 - 30 POB, Size (L×W×H): 23m X 10.5m X 12.5m, Total Weight: 657 tons, Main Material: Carbon Steel
 - Scope of Work:Engineering, Detail design, Procurement, Onshore construction, Fabrication design, Load-out
 
 - Al Khafji Oil Field
- Khafji Crude Related Offshore Projects Cellar Deck, LQ & Bridge
 - Client:Khafji Joint Operation
 - Location:Offshore Khafji, the Middle East
 - Description:Cellar Deck, Weight: 650 tons, LQ: 4 Floors + Helideck, Weight: 2,900 tons, Accommodation: 69 persons, Bridge: Weight: 40 tons, Main Material: Carbon Steel
 - Scope of Work:Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management, etc.
 
 - Cheng Dao Xi Oil Field
- DPB Platform Living Quarter
 - Client:Noble Energy
 - Location:Shan Dong, P.R. China
 - 3 Floors, Size (L×W×H): 20m×11 m×11m, Weight: 560 tons, Accommodation: 56 persons, Main Material: Carbon Steel
 - Scope of Work:Engineering, Procurement, Onshore construction, Pre-commissioning, Load-out, Project management
 
 - Suizhong 36-1 Oil Field
- I/ LD5-2 Oil Field CEPK Living Quarter
 - Client:CNOOC
 - Location:Tanggu, Tianjin, P.R. China
 - Description:4 Floors ﹢ Helideck, Size (L×W×H): 30m×11.5 m×13m, Weight: 1200 tons, Accommodation: 100 persons, Main Material: Carbon Steel,
 - Scope of Work:Detail design, Fabrication design, Material procurement, Fabrication, Erection, Testing, Pre-commissioning, Overall project management, Technical support for offshore installation, hook-up, and commissioning
 
 - Lvda Offshore Oil and Gas Field
- Lv Da WHPA & WHPB Living Quarter
 - Client:CNOOC
 - Location:Bohai Bay, China
 - Description:
- WHPA LQ (100-man): 5 Floors ﹢ Helideck, Size (L×W×H): 25m×13m×18.5m, Weight: 1012 tons, Accommodation: 100 persons
 - WHPB LQ (30-man): 3 Floors ﹢ Helideck, Size (L×W×H): 23m×11.5m×11.5m, Weight: 502 tons, Accommodation: 30 persons
 
 - Scope of Work:Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Part of offshore hook-up & commissioning
 
 - Penglai 19-3 Oil Field
- Bohai Bay Phase II WHPE LQ
 - Client:ConocoPhillips China Ltd.
 - Location:Bohai Bay, P.R. China
 - Description:5 Floors ﹢ Helideck, Size (L×W×H): 44.5m×23m×26.08m, Weight: 1520 tons, Accommodation: 100 persons, Main Material: Carbon Steel
 - Scope of Work:Detail design, Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Part of offshore hook- up & commissioning
 
 - Penglai 19-3 Oil Field
- Bohai Bay Phase II WHPF LQ
 - Client:ConocoPhillips China Ltd.
 - Location:Bohai Bay, P.R. China
 - Description:3 Floors ﹢ Helideck, Size (L×W×H): 60m×24m×21m, Weight: 1487 tons, Accommodation: 100 persons, Main Material: Carbon Steel
 - Scope of Work:Detail design, Fabrication design, Engineering, procurement, Onshore construction & pre-commissioning, Load-out, Part of offshore hook- up & commissioning
 
 - Penglai 19-3 Oil Field
- Bohai Bay Phase II WHPD LQ
 - Client:ConocoPhillips China Ltd.
 - Location:Bohai Bay, P.R. China
 - Description:5 Floors ﹢ Helideck, Size (L×W×H): 49m×35.5m×23m, Weight: 1390 tons, Accommodation: 100 persons, Main Material: Carbon Steel
 - Scope of Work:Detail design, Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Part of offshore hook-up & commissioning
 
 - Penglai 19-3 Oil Field
- Bohai Bay Phase II WHPB LQ
 - Client:ConocoPhillips China Ltd.
 - Location:Bohai Bay, P.R. China
 - Description:·6 Floors ﹢ Helideck, Size (L×W×H): 62m×35m×26m, Weight: 2003 tons, Accommodation: 100 persons, Main Material: Carbon Steel
 - Scope of Work:Detail design, Fabrication design, Engineering, Procurement, Onshore, Construction & pre-commissioning, Load-out, Part of offshore hook- up & commissioning
 
 - Pemex Mexico Bay Two LQ Client:China Oilfield Service Limited (COSL) Location:Gulf of Mexico
- Description:
- 2 Living Quarters
 - 4 Floors ﹢ Helideck
 - Size: 35 m×14 m
 - Weight: 672 tons (for Each)
 - Accommodation: 80 persons
 - Main Material: Carbon Steel
 
 - Scope of Work:
- Fabrication Design, Procurement, Onshore Construction, Inspection, Pre-commissioning, Load-out, Overall Project Management & Control
 
 
 - Description:
 - Penglai 19-3 Oil Field
- Bohai Bay Phase II WHPC LQ
 - Client:ConocoPhillips China Ltd.
 - Location:Bohai Bay, P.R. China
 - Description:3 Floors ﹢ Helideck, Size (L×W×H): 49m×35.5m×23m, Weight: 1210 tons, Accommodation: 70 persons, Main Material: Carbon Steel
 - Scope of Work:Detail design, Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Part of offshore hook-up & commissioning
 
 - Suizhong 36-1 Oil Field
- SZ36-1 Oil Field Phase I B Area LQ
 - Client:CNOOC
 - Location:Bohai Bay, P.R. China
 - Description:3 Floors ﹢ Helideck
 - Size (L×W×H): 23m×10m×10m, Weight: 550 tons, Accommodation: 47 persons
 - Main Material: Carbon Steel
 - Scope of Work:Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Sea-fastening, Offshore hook-up & commissioning
 
 - Qikou 18-1 Oil Field
- Bohai Bay, P.R. China
 - CNOOC
 - Two LQ Modules - 3 Floors ﹢ Helideck
- QK18-1/LQ: Size (L×W×H): 23m×10m×10m, Weight: 610 tons, Accommodation: 54 persons
 - QK17-3/LQ: Size: 21m×10m×10m, Weight: 570 tons, Accommodation: 47 persons
 
 - Scope of Work:Fabrication design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Sea-fastening, Offshore hook-up & commissioning
 
 - Qikou 17-2 Oil Field
- QK17-2 Oil Field LQ
 - Client:CNOOC
 - Location:Bohai Bay, P.R. China
 - Description:3 Floors ﹢ Helideck
 - Size (L×W×H): 23m×10.5m×10m
 - Weight: 650 tons
 - Accommodation: 51 persons
 - Main Material: Carbon Steel
 - Scope of Work:Fabrication design, Engineering Procurement, Onshore construction & pre-commissioning, Load-out, Sea-fastening, Offshore hook-up & commissioning
 
 - Zhao Dong Oil Field
- Zhao Dong Oil Field LQ
 - Apache
 - Bohai Bay, P.R. China
 - Description: 4 Floors ﹢ Helideck, Size (L×W×H): 32m×13.5m×16m, Weight: 1200 tons, Accommodation: 132 persons, Main Material: Carbon Steel
 - Scope of Work:Detail design, Engineering, Procurement, Onshore construction & pre-commissioning, Load-out, Sea-fastening, Offshore hook-up & commissioning
 
 - Penglai 19-3 Oil Field
- PL19-3 Oil Field Phase I Development Project WHPA LQ
 - Client:ConocoPhillips China Inc.
 - Location:Bohai Bay, P.R. China
 - Description:
- Size (L×W×H): 15m×12.5m×10m
 - Weight Limitation: 139 tons
 - Final Weighing: 127 tons
 - Accommodation: 50 persons
 - Main Material: 316LS.S. & Aluminum
 
 - Scope of Work:
- Fabrication design
 - Engineering
 - Procurement
 - Onshore construction
 - Offshore commissioning
 
 
 