Difference between revisions of "Paiute Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Idaho-Nevada border * Destination: California-Nevada state line * Ownership: Paiute Pipeline * Website: http://paiutepipeline.com/ * Length: k...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Source: Idaho-Nevada border | * Source: Idaho-Nevada border | ||
Line 9: | Line 9: | ||
* Status: Operating | * Status: Operating | ||
− | + | === Details === | |
* Paiute Pipeline Company owns and operates an interstate pipeline system which extends from a point of interconnection with the facilities of [[Northwest Gas Pipeline Corporation]] at the Idaho-Nevada border to the California-Nevada state line near the north and south ends of Lake Tahoe , where Paiute delivers gas into the facilities of three local distribution companies. | * Paiute Pipeline Company owns and operates an interstate pipeline system which extends from a point of interconnection with the facilities of [[Northwest Gas Pipeline Corporation]] at the Idaho-Nevada border to the California-Nevada state line near the north and south ends of Lake Tahoe , where Paiute delivers gas into the facilities of three local distribution companies. | ||
* It connects to the [[Tuscarora Gas Transmission Company Pipeline]] in Wadsworth, Nevada | * It connects to the [[Tuscarora Gas Transmission Company Pipeline]] in Wadsworth, Nevada | ||
* Paiute operates a peak shaving storage facility near Lovelock, Nevada. | * Paiute operates a peak shaving storage facility near Lovelock, Nevada. | ||
− | + | === History === | |
* 1996 - Elko Lateral project completed | * 1996 - Elko Lateral project completed | ||
* 1997 - North Tahoe Lateral project completed | * 1997 - North Tahoe Lateral project completed | ||
Line 21: | Line 21: | ||
* 2007 - Expansion project completed | * 2007 - Expansion project completed | ||
* 2008 - South Tahoe Lateral project completed | * 2008 - South Tahoe Lateral project completed | ||
− | * | + | * 2015 - Elko Area Expansion Project completed |
+ | * 2018 - Paiute Expansion Project completed | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [http://paiutepipeline.com/general.htm Paiute Pipeline] | # [http://paiutepipeline.com/general.htm Paiute Pipeline] | ||
# [[EIA Natural Gas Pipeline Projects]] | # [[EIA Natural Gas Pipeline Projects]] | ||
+ | # [[EIA Natural Gas Pipeline Projects 2015-2022]] |
Latest revision as of 16:29, 13 May 2024
Summary Information
- Source: Idaho-Nevada border
- Destination: California-Nevada state line
- Ownership: Paiute Pipeline
- Website: http://paiutepipeline.com/
- Length: kilometres ( miles)
- Capacity: per day
- Status: Operating
Details
- Paiute Pipeline Company owns and operates an interstate pipeline system which extends from a point of interconnection with the facilities of Northwest Gas Pipeline Corporation at the Idaho-Nevada border to the California-Nevada state line near the north and south ends of Lake Tahoe , where Paiute delivers gas into the facilities of three local distribution companies.
- It connects to the Tuscarora Gas Transmission Company Pipeline in Wadsworth, Nevada
- Paiute operates a peak shaving storage facility near Lovelock, Nevada.
History
- 1996 - Elko Lateral project completed
- 1997 - North Tahoe Lateral project completed
- 2000 - Carson Lateral Replacement project completed
- 2003 - Carson Lateral Upgrade project completed
- 2007 - Expansion project completed
- 2008 - South Tahoe Lateral project completed
- 2015 - Elko Area Expansion Project completed
- 2018 - Paiute Expansion Project completed