Difference between revisions of "Big Bend and Dantzler Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
 
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
 
* Operator:  
 
* Operator:  
* Country:  
+
* Country: USA
* Location:  
+
* Location: Mississippi Canyon, GofM
* Production start:  
+
* Production start: 2015
 
* Partners:  
 
* Partners:  
 
* Type: Oil / Gas
 
* Type: Oil / Gas
Line 10: Line 10:
  
 
=== Description ===
 
=== Description ===
*  
+
* The Big Bend field is 18 miles from the Thunder Hawk platform in 7,200 feet of water in Mississippi Canyon Block 698 and the Dantzler field is 7 miles from the Thunder Hawk platform in 6,580 feet of water in Mississippi Canyon Block 782
 +
* They are both tied back to the Thunder Hawk platform
  
 
=== Contractors ===
 
=== Contractors ===
* -
+
* '''EMAS AMC:''' Engineering, procurement, construction and installation of subsea tie-backs
  
 
=== History ===
 
=== History ===
 +
* 2015 - W&T Offshore Announces First Production at Big Bend
 
* 2024 - Talos acquired QuarterNorth Energy becoming a partner in the field
 
* 2024 - Talos acquired QuarterNorth Energy becoming a partner in the field
  
Line 22: Line 24:
  
 
=== Links ===
 
=== Links ===
 +
# [http://killajoules.wikidot.com/blog:6069 W&T Offshore Announces First Production at Big Bend Field]
 
# [https://a-barrel-full.blogspot.com/2024/01/talos-energy-announces-strategic.html Talos Energy Announces Strategic Acquisition of QuarterNorth Energy]
 
# [https://a-barrel-full.blogspot.com/2024/01/talos-energy-announces-strategic.html Talos Energy Announces Strategic Acquisition of QuarterNorth Energy]
  
  
 
[[category:Field]]
 
[[category:Field]]
[[category:country]]
+
[[category:USA]]
[[category:company]]
+
[[category:W&T Offshore]]

Latest revision as of 17:05, 21 January 2024

Summary Information

  • Operator:
  • Country: USA
  • Location: Mississippi Canyon, GofM
  • Production start: 2015
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Big Bend field is 18 miles from the Thunder Hawk platform in 7,200 feet of water in Mississippi Canyon Block 698 and the Dantzler field is 7 miles from the Thunder Hawk platform in 6,580 feet of water in Mississippi Canyon Block 782
  • They are both tied back to the Thunder Hawk platform

Contractors

  • EMAS AMC: Engineering, procurement, construction and installation of subsea tie-backs

History

  • 2015 - W&T Offshore Announces First Production at Big Bend
  • 2024 - Talos acquired QuarterNorth Energy becoming a partner in the field

Geology

Links

  1. W&T Offshore Announces First Production at Big Bend Field
  2. Talos Energy Announces Strategic Acquisition of QuarterNorth Energy