Difference between revisions of "Big Bend and Dantzler Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
* Operator: | * Operator: | ||
− | * Country: | + | * Country: USA |
− | * Location: | + | * Location: Mississippi Canyon, GofM |
− | * Production start: | + | * Production start: 2015 |
* Partners: | * Partners: | ||
* Type: Oil / Gas | * Type: Oil / Gas | ||
Line 10: | Line 10: | ||
=== Description === | === Description === | ||
− | * | + | * The Big Bend field is 18 miles from the Thunder Hawk platform in 7,200 feet of water in Mississippi Canyon Block 698 and the Dantzler field is 7 miles from the Thunder Hawk platform in 6,580 feet of water in Mississippi Canyon Block 782 |
+ | * They are both tied back to the Thunder Hawk platform | ||
=== Contractors === | === Contractors === | ||
− | * - | + | * '''EMAS AMC:''' Engineering, procurement, construction and installation of subsea tie-backs |
=== History === | === History === | ||
+ | * 2015 - W&T Offshore Announces First Production at Big Bend | ||
* 2024 - Talos acquired QuarterNorth Energy becoming a partner in the field | * 2024 - Talos acquired QuarterNorth Energy becoming a partner in the field | ||
Line 22: | Line 24: | ||
=== Links === | === Links === | ||
+ | # [http://killajoules.wikidot.com/blog:6069 W&T Offshore Announces First Production at Big Bend Field] | ||
# [https://a-barrel-full.blogspot.com/2024/01/talos-energy-announces-strategic.html Talos Energy Announces Strategic Acquisition of QuarterNorth Energy] | # [https://a-barrel-full.blogspot.com/2024/01/talos-energy-announces-strategic.html Talos Energy Announces Strategic Acquisition of QuarterNorth Energy] | ||
[[category:Field]] | [[category:Field]] | ||
− | [[category: | + | [[category:USA]] |
− | [[category: | + | [[category:W&T Offshore]] |
Latest revision as of 17:05, 21 January 2024
Summary Information
- Operator:
- Country: USA
- Location: Mississippi Canyon, GofM
- Production start: 2015
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Big Bend field is 18 miles from the Thunder Hawk platform in 7,200 feet of water in Mississippi Canyon Block 698 and the Dantzler field is 7 miles from the Thunder Hawk platform in 6,580 feet of water in Mississippi Canyon Block 782
- They are both tied back to the Thunder Hawk platform
Contractors
- EMAS AMC: Engineering, procurement, construction and installation of subsea tie-backs
History
- 2015 - W&T Offshore Announces First Production at Big Bend
- 2024 - Talos acquired QuarterNorth Energy becoming a partner in the field