Big Bend and Dantzler Oil and Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator:
- Country: USA
- Location: Mississippi Canyon, GofM
- Production start: 2015
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Big Bend field is 18 miles from the Thunder Hawk platform in 7,200 feet of water in Mississippi Canyon Block 698 and the Dantzler field is 7 miles from the Thunder Hawk platform in 6,580 feet of water in Mississippi Canyon Block 782
- They are both tied back to the Thunder Hawk platform
Contractors
- EMAS AMC: Engineering, procurement, construction and installation of subsea tie-backs
History
- 2015 - W&T Offshore Announces First Production at Big Bend
- 2024 - Talos acquired QuarterNorth Energy becoming a partner in the field