Difference between revisions of "Sur de Texas – Tuxpan Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 6: Line 6:
 
* Website: https://www.tcenergy.com/  
 
* Website: https://www.tcenergy.com/  
 
* Length: 770 kilometres (478 miles)  
 
* Length: 770 kilometres (478 miles)  
* Capacity: per day  
+
* Capacity: 2.6 bcf per day  
* Status: (Operating/Planned/Under Construction)
+
* Status: Operating
  
 
=== Details ===
 
=== Details ===
* Running almost entirely under the Gulf of Mexico, this 800 km (497 mile) long pipeline will deliver natural gas to state of Veracruz.
+
* Running almost entirely under the Gulf of Mexico, this 800 km (497 mile) long pipeline delivers natural gas from the USA to state of Veracruz.
  
 
=== History ===
 
=== History ===
 
* 2016 - Transcanada JV chosen to build the pipeline
 
* 2016 - Transcanada JV chosen to build the pipeline
 
* 2017 - EPC contract awarded
 
* 2017 - EPC contract awarded
 +
* 2019 - Pipeline started operations
  
 
=== Other Information ===
 
=== Other Information ===

Revision as of 15:13, 9 January 2024

Summary Information

  • Source: Sur de Texas
  • Destination: Tuxpan, Veracruz
  • Ownership: TC Energy
  • Website: https://www.tcenergy.com/
  • Length: 770 kilometres (478 miles)
  • Capacity: 2.6 bcf per day
  • Status: Operating

Details

  • Running almost entirely under the Gulf of Mexico, this 800 km (497 mile) long pipeline delivers natural gas from the USA to state of Veracruz.

History

  • 2016 - Transcanada JV chosen to build the pipeline
  • 2017 - EPC contract awarded
  • 2019 - Pipeline started operations

Other Information

  • -

Links

  1. Sicim Pipeline References
  2. TransCanada Partnership Awarded Contract to Build US$2.1 Billion Sur de Texas – Tuxpan Natural Gas Pipeline in Mexico