Difference between revisions of "Mathura Refinery"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
* Website: http://www.iocl.com/
 
* Website: http://www.iocl.com/
 
* List of [[Indian Oil Company Refineries]]
 
* List of [[Indian Oil Company Refineries]]
Location: Uttar Pradesh
+
* Location: Uttar Pradesh
Capacity: 8.0 million tons/annum & 160,000 bbl/day
+
* Capacity: 8.0 million tons/annum & 160,000 bbl/day
Nelson Complexity:
+
* Nelson Complexity:
Refining Depth:
+
* Refining Depth:
=== Brief Description
+
=== Brief Description ===
A medium sized medium complexity refinery
+
* A medium sized medium complexity refinery
=== Refining Units
+
=== Refining Units ===
Atmospheric Distillation
+
* Atmospheric Distillation
Vacuum Distillation
+
* Vacuum Distillation
Hydrocracker
+
* Hydrocracker
FCC
+
* FCC
Isomerization Unit
+
* Isomerization Unit
Diesel Desulphurisation
+
* Diesel Desulphurisation
Prime-G+ unit
+
* Prime-G+ unit
 
=== Terminal Capacity ===
 
=== Terminal Capacity ===
Crude Oil:
+
* Crude Oil:
Refined Products:
+
* Refined Products:
 
=== Crude Supply ===
 
=== Crude Supply ===
 
-
 
-
 
=== Products Produced ===
 
=== Products Produced ===
LPG, Gasoline, Diesel
+
* LPG, Gasoline, Diesel
 
=== Projects ===
 
=== Projects ===
The Mathura Refinery Upgrade Project will add a residue hydrocracking unit to eliminate residual fuel oil.
+
* The [[Mathura Refinery Upgrade Project]] will add a residue hydrocracking unit to eliminate residual fuel oil.
 
=== Other Information ===
 
=== Other Information ===
 
-
 
-
 
=== History ===
 
=== History ===
1982 - The refinery is commissioned with 6 million TPA capacity
+
* 1982 - The refinery is commissioned with 6 million TPA capacity
1989 - Revamp of Refinery to increase capacity from 6 to 7.5 Million TPA
+
* 1989 - Revamp of Refinery to increase capacity from 6 to 7.5 Million TPA
1996 - 26,000 TPA Propylene Recovery Unit commissioned
+
* 1996 - 26,000 TPA Propylene Recovery Unit commissioned
1997 - 500,000 TPA Catalytic Reformer commissioned
+
* 1997 - 500,000 TPA Catalytic Reformer commissioned
1998 - FCC Unit Revamped
+
* 1998 - FCC Unit Revamped
2000 - 1.0 mtpa DHDS & 1.2 mtpa Hydrocracker commissioned
+
* 2000 - 1.0 mtpa DHDS & 1.2 mtpa Hydrocracker commissioned
2004 - CDU revamped to reduce costs
+
* 2004 - CDU revamped to reduce costs
2006 - Isomerization Unit commissioned
+
* 2006 - Isomerization Unit commissioned
2007 - Axens selected for FCC gasoline treatment
+
* 2007 - Axens selected for FCC gasoline treatment
2016 - Construction of OCTAMAX unit launched
+
* 2007 - Bitumen unit revamp completed
2017 - CB&I awarded licence for residue hydrocracker
+
* 2016 - Construction of OCTAMAX unit launched
 +
* 2017 - CB&I awarded licence for residue hydrocracker
 +
 
 
=== Links ===
 
=== Links ===
Engineers India Refining References
+
# [[Daelim Oil And Gas Projects]]
Punj Lloyd Refining References
+
# [[Engineers India Refining References]]
Daelim Oil And Gas Projects
+
# [[Poerner Bitumen References]]
UOP and IOCL Start-up First Penex(TM) Process Technology Isomerization Unit in India; UOP technology to help meet India's clean fuel specifications
+
# [[Punj Lloyd Refining References]]
India Expands Clean Fuels Programs
+
# [http://killajoules.wikidot.com/archive:uop-and-iocl-start-up-first-penex-tm-process-technol UOP and IOCL Start-up First Penex(TM) Process Technology Isomerization Unit in India; UOP technology to help meet India's clean fuel specifications]
MoS (IC), P&NG lays foundation stone of OCTAMAX unit at Mathura Refinery
+
# [http://killajoules.wikidot.com/archive:india-expands-clean-fuels-programs India Expands Clean Fuels Programs]
[CB&I Announces Residue Upgrading Technology Award - First Ever Unit in India http://killajoules.wikidot.com/archive:http:www-mcdermott-investors-com-news-historical-cbi]
+
# [http://killajoules.wikidot.com/archive:mos-ic-p-ng-lays-foundation-stone-of-octamax-unit-at MoS (IC), P&NG lays foundation stone of OCTAMAX unit at Mathura Refinery]
 +
# [http://killajoules.wikidot.com/archive:http:www-mcdermott-investors-com-news-historical-cbi CB&I Announces Residue Upgrading Technology Award - First Ever Unit in India]
 +
 
 +
[[category:Refinery]]
 +
[[category:India]]
 +
[[category:IOCL]]

Latest revision as of 14:19, 20 November 2023

Summary Information

Brief Description

  • A medium sized medium complexity refinery

Refining Units

  • Atmospheric Distillation
  • Vacuum Distillation
  • Hydrocracker
  • FCC
  • Isomerization Unit
  • Diesel Desulphurisation
  • Prime-G+ unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • LPG, Gasoline, Diesel

Projects

Other Information

-

History

  • 1982 - The refinery is commissioned with 6 million TPA capacity
  • 1989 - Revamp of Refinery to increase capacity from 6 to 7.5 Million TPA
  • 1996 - 26,000 TPA Propylene Recovery Unit commissioned
  • 1997 - 500,000 TPA Catalytic Reformer commissioned
  • 1998 - FCC Unit Revamped
  • 2000 - 1.0 mtpa DHDS & 1.2 mtpa Hydrocracker commissioned
  • 2004 - CDU revamped to reduce costs
  • 2006 - Isomerization Unit commissioned
  • 2007 - Axens selected for FCC gasoline treatment
  • 2007 - Bitumen unit revamp completed
  • 2016 - Construction of OCTAMAX unit launched
  • 2017 - CB&I awarded licence for residue hydrocracker

Links

  1. Daelim Oil And Gas Projects
  2. Engineers India Refining References
  3. Poerner Bitumen References
  4. Punj Lloyd Refining References
  5. UOP and IOCL Start-up First Penex(TM) Process Technology Isomerization Unit in India; UOP technology to help meet India's clean fuel specifications
  6. India Expands Clean Fuels Programs
  7. MoS (IC), P&NG lays foundation stone of OCTAMAX unit at Mathura Refinery
  8. CB&I Announces Residue Upgrading Technology Award - First Ever Unit in India