Difference between revisions of "Summit LNG Terminal"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs)  (Created page with "=== Summary Information ===  * Ownership:  * Website:  * Location:  * Capacity: million tons/annum * Status:  === Brief Description ===   === Technical Details ===  * Storage...") | Abarrelfull (talk | contribs)  | ||
| (6 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| === Summary Information === | === Summary Information === | ||
| − | * Ownership:   | + | * Ownership: Summit Power International | 
| − | * Website:   | + | * Website: https://summitpowerinternational.com/ | 
| − | * Location:   | + | * Location: Moheshkhali Island, Bangladesh | 
| − | * Capacity: million tons/annum | + | * Capacity: 3.75 million tons/annum | 
| − | * Status:   | + | * Status: In operation | 
| + | |||
| === Brief Description === | === Brief Description === | ||
| − | + | * The terminal includes the provision of Excelerate’s floating storage and regasification unit (FSRU), Summit LNG. The FSRU has 138,000 m3 of LNG storage capacity and a base regasification capacity of 500 million standard cubic feet per day. | |
| === Technical Details === | === Technical Details === | ||
| Line 17: | Line 18: | ||
| === Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
| − | + | * The terminal was commissioned in [[LNG Terminal Projects Completed in 2019 | 2019]] | |
| === Suppliers / Customers === | === Suppliers / Customers === | ||
| − | * Suppliers: | + | * Suppliers: Excelerate will deliver 0.85 MTPA of LNG in 2026 and 2027 and 1 MTPA from 2028 to 2040, shared between its two terminals | 
| − | * Customers: | + | * Customers: A pipeline connects the liquefied natural gas (LNG) terminal to the national grid | 
| === History === | === History === | ||
| − | *  | + | * 2017 - Summit entered into a 15-year charter agreement with Excelerate for the FSRU Summit LNG | 
| + | * 2019 - Terminal commissioned | ||
| + | * 2023 - Excelerate Energy and Petrobangla Sign Long-Term LNG Sale and Purchase Agreement | ||
| === Other Information === | === Other Information === | ||
| Line 32: | Line 35: | ||
| - | - | ||
| === Links === | === Links === | ||
| − | # | + | # [https://abarrelfull.blogspot.com/2022/01/natural-gas-flows-from-summit-lng-month.html  Natural gas flows from 'Summit LNG' a month ahead of schedule] | 
| + | # [https://lng-news.blogspot.com/2023/11/excelerate-energy-and-petrobangla-sign.html Excelerate Energy and Petrobangla Sign Long-Term LNG Sale and Purchase Agreement] | ||
| [[category:LNG]] | [[category:LNG]] | ||
| − | [[category: | + | [[category:Bangladesh]] | 
| − | |||
Latest revision as of 12:29, 8 November 2023
Contents
Summary Information
- Ownership: Summit Power International
- Website: https://summitpowerinternational.com/
- Location: Moheshkhali Island, Bangladesh
- Capacity: 3.75 million tons/annum
- Status: In operation
Brief Description
- The terminal includes the provision of Excelerate’s floating storage and regasification unit (FSRU), Summit LNG. The FSRU has 138,000 m3 of LNG storage capacity and a base regasification capacity of 500 million standard cubic feet per day.
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- The terminal was commissioned in 2019
Suppliers / Customers
- Suppliers: Excelerate will deliver 0.85 MTPA of LNG in 2026 and 2027 and 1 MTPA from 2028 to 2040, shared between its two terminals
- Customers: A pipeline connects the liquefied natural gas (LNG) terminal to the national grid
History
- 2017 - Summit entered into a 15-year charter agreement with Excelerate for the FSRU Summit LNG
- 2019 - Terminal commissioned
- 2023 - Excelerate Energy and Petrobangla Sign Long-Term LNG Sale and Purchase Agreement
Other Information
-
