Difference between revisions of "Britannia Gas Field"

From A Barrel Full
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
* Operator: ConocoPhillips
+
* Operator: Harbour Energy
 
* Country: UK  
 
* Country: UK  
 
* Location: 130 miles northeast of Aberdeen  
 
* Location: 130 miles northeast of Aberdeen  
 
* Production start: 1998
 
* Production start: 1998
* Partners: ConocoPhillips (58.7%), Chevron (32.3%), Mitsui (9.0%)
+
* Partners: Harbour Energy (58.7%), Ithaca (32.3%), Neo Energy (9.0%)
 
* Type: Gas
 
* Type: Gas
 
* Estimated Reserves:
 
* Estimated Reserves:
Line 13: Line 13:
 
* Britannia is one of the largest natural gas and condensate fields in the North Sea.
 
* Britannia is one of the largest natural gas and condensate fields in the North Sea.
 
* The field has two manned platforms, the original Britannia Platform and a smaller Bridge Linked platform added later
 
* The field has two manned platforms, the original Britannia Platform and a smaller Bridge Linked platform added later
 +
* The '''Finlaggan Gas Field''' is a 2 well tie back to Britannia platform.
 
* Condensate is delivered through the [[Forties Pipeline System]] to the oil stabilization and processing plant, Kerse of Kinneil, near the Grangemouth Refinery in Scotland,  
 
* Condensate is delivered through the [[Forties Pipeline System]] to the oil stabilization and processing plant, Kerse of Kinneil, near the Grangemouth Refinery in Scotland,  
* Natural gas is transported through a dedicated [[Britannia Gas Pipeline]] to the [[Sage St Fergus Gas Processing Terminal]] at St. Fergus, Scotland.
+
* Natural gas is transported through a dedicated [[Britannia Gas Pipeline]] to the [[SAGE St Fergus Gas Processing Terminal]] at St. Fergus, Scotland.
* [[Callanish And Brodgar Oil And Gas Fields]] have been developed as satellites
+
* [[Callanish and Brodgar Oil and Gas Fields]] have been developed as satellites
  
 
=== Contractors ===
 
=== Contractors ===
Line 21: Line 22:
 
* **Wilton Engineering:** Fabrication of the Long Term Compression (LTC) module  
 
* **Wilton Engineering:** Fabrication of the Long Term Compression (LTC) module  
 
* **Saipem:**  
 
* **Saipem:**  
* Mono Column and Compression Module  
+
** Mono Column and Compression Module  
* Export pipeline T&I
+
** Export pipeline T&I
 
* **Foundocean:** Grouting for the compression project
 
* **Foundocean:** Grouting for the compression project
 
* **BiFab:** Britannia Phase 2  EPC contract for LER
 
* **BiFab:** Britannia Phase 2  EPC contract for LER
Line 34: Line 35:
 
* 2008 - Production started from the BLP
 
* 2008 - Production started from the BLP
 
* 2012 - BP Announces Sale of 8.97% Interest in Britannia to Mitsui
 
* 2012 - BP Announces Sale of 8.97% Interest in Britannia to Mitsui
 +
* 2018 - Approval for Finlaggan
 
* 2019 - Ithaca energy acquired Chevron's stake
 
* 2019 - Ithaca energy acquired Chevron's stake
 +
* 2019 - Chrysaor acquired Conocophillips's stake in the field
 +
* 2021 - Neo Energy acquired Zennor Petroleum getting a stake in Britannia
 +
* 2021 - Finlaggan field came onstream
  
 
=== Geology ===
 
=== Geology ===
Line 47: Line 52:
 
# [[FoundOcean Europe Subsea References]]
 
# [[FoundOcean Europe Subsea References]]
 
# [[Global Maritime Pipeline References]]
 
# [[Global Maritime Pipeline References]]
 +
# [[Jotun Platform References]]
 
# [http://killajoules.wikidot.com/archive:dragados-off-shore-sends-the-campo-britannia-jacket Dragados Off-Shore sends the Campo Britannia jacket, a 21,000 ton oil platform, to the North Sea]
 
# [http://killajoules.wikidot.com/archive:dragados-off-shore-sends-the-campo-britannia-jacket Dragados Off-Shore sends the Campo Britannia jacket, a 21,000 ton oil platform, to the North Sea]
 
# [http://killajoules.wikidot.com/blog:2702 BP Announces Sale of Interests in Alba and Britannia Fields to Mitsui & CO., LTD.]
 
# [http://killajoules.wikidot.com/blog:2702 BP Announces Sale of Interests in Alba and Britannia Fields to Mitsui & CO., LTD.]
Line 55: Line 61:
 
# [http://killajoules.wikidot.com/archive:wilton-engineering-services-wins-significant-uk-nort Wilton Engineering Services wins significant UK North Sea contract]
 
# [http://killajoules.wikidot.com/archive:wilton-engineering-services-wins-significant-uk-nort Wilton Engineering Services wins significant UK North Sea contract]
 
# [https://abarrelfull.blogspot.com/2023/05/acquisition-of-chevron-north-sea-limited.html Acquisition Of Chevron North Sea Limited]
 
# [https://abarrelfull.blogspot.com/2023/05/acquisition-of-chevron-north-sea-limited.html Acquisition Of Chevron North Sea Limited]
 +
# [https://abarrelfull.blogspot.com/2023/10/conocophillips-completes-27-billion.html ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries]
 +
# [https://abarrelfull.blogspot.com/2023/08/neo-energy-to-acquire-zennor-petroleum.html NEO Energy to acquire Zennor Petroleum]
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:UK]]
 
[[category:UK]]
[[category:ConocoPhillips]]
+
[[category:Harbour Energy]]

Latest revision as of 08:20, 31 October 2023

Summary Information

  • Operator: Harbour Energy
  • Country: UK
  • Location: 130 miles northeast of Aberdeen
  • Production start: 1998
  • Partners: Harbour Energy (58.7%), Ithaca (32.3%), Neo Energy (9.0%)
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The 13,000-ft-deep Britannia field is located in U.K. Continental Shelf Blocks 15/29a, 15/30, 16/26, 16/27a, and 16/27b, 130 miles northeast of Aberdeen in approximately 450 ft of water
  • Britannia is one of the largest natural gas and condensate fields in the North Sea.
  • The field has two manned platforms, the original Britannia Platform and a smaller Bridge Linked platform added later
  • The Finlaggan Gas Field is a 2 well tie back to Britannia platform.
  • Condensate is delivered through the Forties Pipeline System to the oil stabilization and processing plant, Kerse of Kinneil, near the Grangemouth Refinery in Scotland,
  • Natural gas is transported through a dedicated Britannia Gas Pipeline to the SAGE St Fergus Gas Processing Terminal at St. Fergus, Scotland.
  • Callanish and Brodgar Oil and Gas Fields have been developed as satellites

Contractors

  • **Dragados Off-Shore:** Construction of Campo Britannia oil platform
  • **Wilton Engineering:** Fabrication of the Long Term Compression (LTC) module
  • **Saipem:**
    • Mono Column and Compression Module
    • Export pipeline T&I
  • **Foundocean:** Grouting for the compression project
  • **BiFab:** Britannia Phase 2 EPC contract for LER
  • **Heerema Marine Contractors:** Britannia Bridge Linked Platform Installation
  • **Global Maritime:** Marine consultants and warranty surveyors

History

  • 1994 - Project development approved by UK Government
  • 1998 - Commercial production began
  • 2008 - Production started from the BLP
  • 2012 - BP Announces Sale of 8.97% Interest in Britannia to Mitsui
  • 2018 - Approval for Finlaggan
  • 2019 - Ithaca energy acquired Chevron's stake
  • 2019 - Chrysaor acquired Conocophillips's stake in the field
  • 2021 - Neo Energy acquired Zennor Petroleum getting a stake in Britannia
  • 2021 - Finlaggan field came onstream

Geology

  • The reservoir contains a retrograde gas/condensate fluid whose composition varies from west to east. The hydrocarbon is richer in the west (condensate/gas ratio of 100 bbl/MMscf) and leaner in the east (condensate/gas ratio of 70 bbl/MMscf).
  • An oil rim lies along the southern edge of the reservoir. Although the oil is a good-quality, light but waxy, sweet crude, it is relatively immobile. An aquifer lies under the oil rim.
  • The length of the reservoir has five distinct regions, each of which has an aquifer with different water chemistry.

Links

  1. List Of Oil Production Platforms In The UK
  2. Saipem Fixed Offshore Production Facilities Project References
  3. Saipem Europe Pipeline References
  4. FoundOcean Europe Subsea References
  5. Global Maritime Pipeline References
  6. Jotun Platform References
  7. Dragados Off-Shore sends the Campo Britannia jacket, a 21,000 ton oil platform, to the North Sea
  8. BP Announces Sale of Interests in Alba and Britannia Fields to Mitsui & CO., LTD.
  9. THE BRITANNIA FIELD DEVELOPMENT
  10. ConocoPhillips, UK
  11. Chevron, Partners Celebrate First Production From U.K.'s Britannia Field
  12. Britannia Operator Limited extends contract with Petrofac
  13. Wilton Engineering Services wins significant UK North Sea contract
  14. Acquisition Of Chevron North Sea Limited
  15. ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries
  16. NEO Energy to acquire Zennor Petroleum