Difference between revisions of "Shin Oak NGL Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: barrels of oil per day * Crude Type: === Brief...") |
Abarrelfull (talk | contribs) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Source: | + | * Source: Gaines County, Texas |
− | * Destination: | + | * Destination: Mont Belvieu, Texas |
− | * Ownership: | + | * Ownership: Enterprise |
− | * Website: | + | * Website: https://www.enterpriseproducts.com/ |
− | * Length: kilometres ( miles) | + | * Length: kilometres (571 miles) |
− | * Capacity: | + | * Capacity: 550,000 barrels of oil per day |
− | * | + | * Product Type: mixed NGLs |
=== Brief Description === | === Brief Description === | ||
− | * - | + | * The Shin Oak NGL pipeline originates at [[Hobbs NGL Fractionation Center]] in Gaines County, Texas. The 24-inch diameter pipeline has an initial design capacity of 250,000 barrels per day (“BPD”), expandable to 600,000 BPD. |
+ | * The pipeline is for NGL's from the Permian basin | ||
+ | * The Waha lateral connects Waha to Mont Belvieu | ||
+ | * An expansion is underway which would add up to 275,000 BPD of capacity, with completion expected in the first half of 2024. | ||
=== Pipeline Status === | === Pipeline Status === | ||
− | * | + | * In operation |
=== History === | === History === | ||
− | * - | + | * 2017 - Final investment decision |
+ | * 2019 - Pipeline enters operations | ||
+ | * 2019 - Altus Midstream acquired a 33% Stake | ||
+ | * 2019 - 34 mile Waha lateral completed | ||
+ | * 2022 - Expansion project launched | ||
=== Other Information === | === Other Information === | ||
Line 24: | Line 31: | ||
=== Links === | === Links === | ||
− | + | # [[EIA Liquids Pipeline Projects 2015-2020]] | |
− | # - | + | # [https://abarrelfull.blogspot.com/2023/09/enterprise-to-build-shin-oak-ngl.html Enterprise to Build Shin Oak NGL Pipeline from Permian Basin to Mont Belvieu, Texas] |
+ | # [https://abarrelfull.blogspot.com/2023/09/enterprise-begins-service-on-shin-oak.html Enterprise Begins Service on Shin Oak NGL Pipeline] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/altus-midstream-acquires-stake-in.html Altus Midstream Acquires Stake in Enterprise’s Shin Oak Pipeline] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/enterprise-announces-three-expansions.html Enterprise Announces Three Expansions in the Permian Basin] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:USA]] | [[category:USA]] | ||
[[category:Enterprise]] | [[category:Enterprise]] |
Latest revision as of 06:43, 28 September 2023
Contents
Summary Information
- Source: Gaines County, Texas
- Destination: Mont Belvieu, Texas
- Ownership: Enterprise
- Website: https://www.enterpriseproducts.com/
- Length: kilometres (571 miles)
- Capacity: 550,000 barrels of oil per day
- Product Type: mixed NGLs
Brief Description
- The Shin Oak NGL pipeline originates at Hobbs NGL Fractionation Center in Gaines County, Texas. The 24-inch diameter pipeline has an initial design capacity of 250,000 barrels per day (“BPD”), expandable to 600,000 BPD.
- The pipeline is for NGL's from the Permian basin
- The Waha lateral connects Waha to Mont Belvieu
- An expansion is underway which would add up to 275,000 BPD of capacity, with completion expected in the first half of 2024.
Pipeline Status
- In operation
History
- 2017 - Final investment decision
- 2019 - Pipeline enters operations
- 2019 - Altus Midstream acquired a 33% Stake
- 2019 - 34 mile Waha lateral completed
- 2022 - Expansion project launched
Other Information
- -