Difference between revisions of "EPIC NGL Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 18: | Line 18: | ||
=== History === | === History === | ||
+ | * 2017 - EPIC JV formed | ||
* 2018 - Sections from Loving, New Mexico, to Orla, Texas and Orla to Crane opened | * 2018 - Sections from Loving, New Mexico, to Orla, Texas and Orla to Crane opened | ||
+ | * 2021 - Sweeny Lateral completed | ||
=== Other Information === | === Other Information === | ||
Line 27: | Line 29: | ||
# [[EIA Liquids Pipeline Projects 2015-2020]] | # [[EIA Liquids Pipeline Projects 2015-2020]] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/epic-y-grade-announces-completion-of.html EPIC Y-Grade Announces Completion Of NGL Super-System Stretching From Corpus Christi to Sweeny, Texas Including Strategic Connections To Premium Purity Markets] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:USA]] | [[category:USA]] |
Revision as of 15:52, 27 September 2023
Contents
Summary Information
- Source:
- Destination:
- Ownership:
- Website:
- Length: kilometres (1,100 miles)
- Capacity: 300,000 barrels of oil per day
- Crude Type: NGLs
Brief Description
- EPIC NGL is a fully integrated NGL system consisting of nearly 1,100 miles of y-grade, ethane, propane, normal butane, isobutane, and natural gasoline pipelines, and fractionation facilities providing critical products supply to petrochemical companies, refineries, and export markets across the Texas Gulf Coast from Corpus Christi to Sweeny, TX.
- The 165-mile Sweeny Lateral connects the Robstown Fractionation Complex to the Sweeny fractionation and storage complex
Pipeline Status
- In operation
History
- 2017 - EPIC JV formed
- 2018 - Sections from Loving, New Mexico, to Orla, Texas and Orla to Crane opened
- 2021 - Sweeny Lateral completed
Other Information
- -