Difference between revisions of "EPIC Crude Oil Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: Delaware and Midland Basin * Destination: Robstown Terminal * Ownership: EPIC * Website: https://epicmid.com/ * Length: kilometres (750...")
 
Line 18: Line 18:
  
 
=== History ===
 
=== History ===
 +
* 2017 - The EPIC JV was formed
 
* 2020 - Pipeline enters operation
 
* 2020 - Pipeline enters operation
  

Revision as of 15:04, 27 September 2023

Summary Information

  • Source: Delaware and Midland Basin
  • Destination: Robstown Terminal
  • Ownership: EPIC
  • Website: https://epicmid.com/
  • Length: kilometres (750 miles)
  • Capacity: 600,000 barrels of oil per day
  • Crude Type:

Brief Description

Pipeline Status

  • In operation

History

  • 2017 - The EPIC JV was formed
  • 2020 - Pipeline enters operation

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2015-2020