Difference between revisions of "Tula Gas Pipeline Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 7: | Line 7: | ||
* Length: 287 km (178 miles) | * Length: 287 km (178 miles) | ||
* Capacity: per day | * Capacity: per day | ||
− | * Status: | + | * Status: Under Construction |
=== Details === | === Details === | ||
Line 14: | Line 14: | ||
=== History === | === History === | ||
− | * - | + | * 2015 - Transcanada awarded contract for the pipeline |
+ | * 2022 - TC Energy and CFE formed a JV to own the pipelines | ||
=== Other Information === | === Other Information === | ||
Line 20: | Line 21: | ||
=== Links === | === Links === | ||
− | # [] | + | # [https://abarrelfull.blogspot.com/2023/04/transcanada-awarded-contract-to-build.html TransCanada Awarded Contract to Build US$500 Million Natural Gas Tuxpan-Tula Pipeline in Mexico] |
+ | # [https://abarrelfull.blogspot.com/2023/09/tc-energy-and-mexicos-comision-federal.html TC Energy And Mexico’s Comisión Federal De Electricidad Announce A First-Of-Its-Kind Strategic Partnership To Develop World-Class Energy Infrastructure In Mexico] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:Mexico]] | [[category:Mexico]] | ||
[[category:TC Energy]] | [[category:TC Energy]] |
Latest revision as of 07:12, 20 September 2023
Summary Information
- Source: Tuxpan, Veracruz
- Destination:
- Ownership: TC Energy
- Website: https://www.tcenergy.com/
- Length: 287 km (178 miles)
- Capacity: per day
- Status: Under Construction
Details
- A natural gas pipeline that will stretch 287 km (178 miles) from end to end, the Tula Pipeline Project will deliver fuel from Tuxpan, Veracruz, to communities in the states of Puebla and Hidalgo. It will have a capacity of 886 million cubic feet per da
- It Interconnects with Sur de Texas – Tuxpan Gas Pipeline and with Villa de Reyes Gas Pipeline Project to supply gas to Central Mexico
History
- 2015 - Transcanada awarded contract for the pipeline
- 2022 - TC Energy and CFE formed a JV to own the pipelines
Other Information
- -