Difference between revisions of "Tula Gas Pipeline Project"

From A Barrel Full
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Source:  
+
* Source: Tuxpan, Veracruz
 
* Destination:  
 
* Destination:  
* Ownership:  
+
* Ownership: TC Energy
* Website:   
+
* Website:  https://www.tcenergy.com/
* Length:  kilometres ( miles)  
+
* Length:  287 km (178 miles)  
 
* Capacity: per day  
 
* Capacity: per day  
* Status: (Operating/Planned/Under Construction)
+
* Status: Under Construction
  
 
=== Details ===
 
=== Details ===
* A natural gas pipeline that will stretch 287 km (178 miles) from end to end, the Tula Pipeline Project will deliver fuel from Tuxpan, Veracruz, to communities in the states of Puebla and Hidalgo.
+
* A natural gas pipeline that will stretch 287 km (178 miles) from end to end, the Tula Pipeline Project will deliver fuel from Tuxpan, Veracruz, to communities in the states of Puebla and Hidalgo. It will have a capacity of 886 million cubic feet per da
 +
* It Interconnects with [[Sur de Texas – Tuxpan Gas Pipeline]] and with [[Villa de Reyes Gas Pipeline Project]] to supply gas to Central Mexico
  
 
=== History ===
 
=== History ===
* -  
+
* 2015 - Transcanada awarded contract for the pipeline
 +
* 2022 - TC Energy and CFE formed a JV to own the pipelines
  
 
=== Other Information ===
 
=== Other Information ===
Line 19: Line 21:
  
 
=== Links ===
 
=== Links ===
# []
+
# [https://abarrelfull.blogspot.com/2023/04/transcanada-awarded-contract-to-build.html TransCanada Awarded Contract to Build US$500 Million Natural Gas Tuxpan-Tula Pipeline in Mexico]
 +
# [https://abarrelfull.blogspot.com/2023/09/tc-energy-and-mexicos-comision-federal.html TC Energy And Mexico’s Comisión Federal De Electricidad Announce A First-Of-Its-Kind Strategic Partnership To Develop World-Class Energy Infrastructure In Mexico]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:Mexico]]
 
[[category:Mexico]]
 
[[category:TC Energy]]
 
[[category:TC Energy]]

Latest revision as of 07:12, 20 September 2023

Summary Information

  • Source: Tuxpan, Veracruz
  • Destination:
  • Ownership: TC Energy
  • Website: https://www.tcenergy.com/
  • Length: 287 km (178 miles)
  • Capacity: per day
  • Status: Under Construction

Details

  • A natural gas pipeline that will stretch 287 km (178 miles) from end to end, the Tula Pipeline Project will deliver fuel from Tuxpan, Veracruz, to communities in the states of Puebla and Hidalgo. It will have a capacity of 886 million cubic feet per da
  • It Interconnects with Sur de Texas – Tuxpan Gas Pipeline and with Villa de Reyes Gas Pipeline Project to supply gas to Central Mexico

History

  • 2015 - Transcanada awarded contract for the pipeline
  • 2022 - TC Energy and CFE formed a JV to own the pipelines

Other Information

  • -

Links

  1. TransCanada Awarded Contract to Build US$500 Million Natural Gas Tuxpan-Tula Pipeline in Mexico
  2. TC Energy And Mexico’s Comisión Federal De Electricidad Announce A First-Of-Its-Kind Strategic Partnership To Develop World-Class Energy Infrastructure In Mexico