Difference between revisions of "Petronius Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Chevron * Country: USA * Location: Viosca Knoll Block 786, Gulf of Mexico * Production start: 2000 * Partners: Marathon - 50% * Type: Oil & G...") |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Chevron | * Operator: Chevron | ||
* Country: USA | * Country: USA | ||
* Location: Viosca Knoll Block 786, Gulf of Mexico | * Location: Viosca Knoll Block 786, Gulf of Mexico | ||
* Production start: 2000 | * Production start: 2000 | ||
− | * Partners: | + | * Partners: Talos - 50% |
* Type: Oil & Gas | * Type: Oil & Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The Petronius project, located in 1,754 feet of water in Viosca Knoll Block 786 | * The Petronius project, located in 1,754 feet of water in Viosca Knoll Block 786 | ||
* The Petronius development consists of a compliant tower structure with production and drilling facilities | * The Petronius development consists of a compliant tower structure with production and drilling facilities | ||
Line 15: | Line 15: | ||
* Oil is transported via the [[Odyssey Oil Pipeline]] | * Oil is transported via the [[Odyssey Oil Pipeline]] | ||
− | + | === Contractors === | |
* **Gulf Island Fabrication:** Module construction | * **Gulf Island Fabrication:** Module construction | ||
− | + | === History === | |
* 1995 - Petronius Oil And Gas Field discovered | * 1995 - Petronius Oil And Gas Field discovered | ||
* 2000 - Petronius Oil And Gas Field comes onstream | * 2000 - Petronius Oil And Gas Field comes onstream | ||
+ | * 2021 - EnVen acquires Marathon's 50% stake | ||
+ | * 2022 - Talos became a partner after acquiring EnVen | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Gulf Of Mexico Permanent Deepwater Structures]] | # [[Gulf Of Mexico Permanent Deepwater Structures]] | ||
# [[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]] | # [[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]] | ||
Line 31: | Line 33: | ||
# [http://killajoules.wikidot.com/archive:texaco-s-petronius-platform-installation-completed-i Texaco's Petronius Platform Installation Completed in Gulf of Mexico] | # [http://killajoules.wikidot.com/archive:texaco-s-petronius-platform-installation-completed-i Texaco's Petronius Platform Installation Completed in Gulf of Mexico] | ||
# [http://killajoules.wikidot.com/archive:texaco-begins-production-from-petronius-project-in-g Texaco Begins Production from Petronius Project in Gulf of Mexico] | # [http://killajoules.wikidot.com/archive:texaco-begins-production-from-petronius-project-in-g Texaco Begins Production from Petronius Project in Gulf of Mexico] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/marathon-oil-signs-agreement-for.html Marathon Oil Signs Agreement for Divestiture of Gulf of Mexico Assets] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/talos-energy-announces-strategic.html Talos Energy Announces Strategic Acquisition of EnVen Energy, Increasing Operational Scale and Improving Financial Profile Through the Addition of Oil-Weighted, Deepwater Assets with Significant Infrastructure] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:USA]] | ||
+ | [[category:Chevron]] | ||
+ | [[category:Talos]] |
Latest revision as of 08:44, 4 September 2023
Summary Information
- Operator: Chevron
- Country: USA
- Location: Viosca Knoll Block 786, Gulf of Mexico
- Production start: 2000
- Partners: Talos - 50%
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Petronius project, located in 1,754 feet of water in Viosca Knoll Block 786
- The Petronius development consists of a compliant tower structure with production and drilling facilities
- The Petronius platform has maximum production capacity of 60,000 barrels of oil per day and 100 million cubic feet of gas per day
- Oil is transported via the Odyssey Oil Pipeline
Contractors
- **Gulf Island Fabrication:** Module construction
History
- 1995 - Petronius Oil And Gas Field discovered
- 2000 - Petronius Oil And Gas Field comes onstream
- 2021 - EnVen acquires Marathon's 50% stake
- 2022 - Talos became a partner after acquiring EnVen
Geology
Links
- Gulf Of Mexico Permanent Deepwater Structures
- Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
- Gulf Island Fabrication Platform References
- Texaco's Petronius Platform Installation Completed in Gulf of Mexico
- Texaco Begins Production from Petronius Project in Gulf of Mexico
- Marathon Oil Signs Agreement for Divestiture of Gulf of Mexico Assets
- Talos Energy Announces Strategic Acquisition of EnVen Energy, Increasing Operational Scale and Improving Financial Profile Through the Addition of Oil-Weighted, Deepwater Assets with Significant Infrastructure