Petronius Oil and Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: Chevron
- Country: USA
- Location: Viosca Knoll Block 786, Gulf of Mexico
- Production start: 2000
- Partners: Talos - 50%
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Petronius project, located in 1,754 feet of water in Viosca Knoll Block 786
- The Petronius development consists of a compliant tower structure with production and drilling facilities
- The Petronius platform has maximum production capacity of 60,000 barrels of oil per day and 100 million cubic feet of gas per day
- Oil is transported via the Odyssey Oil Pipeline
Contractors
- **Gulf Island Fabrication:** Module construction
History
- 1995 - Petronius Oil And Gas Field discovered
- 2000 - Petronius Oil And Gas Field comes onstream
- 2021 - EnVen acquires Marathon's 50% stake
- 2022 - Talos became a partner after acquiring EnVen
Geology
Links
- Gulf Of Mexico Permanent Deepwater Structures
- Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
- Fiberbond North America Offshore Platform References
- Gulf Island Fabrication Platform References
- Texaco's Petronius Platform Installation Completed in Gulf of Mexico
- Texaco Begins Production from Petronius Project in Gulf of Mexico
- Marathon Oil Signs Agreement for Divestiture of Gulf of Mexico Assets
- Talos Energy Announces Strategic Acquisition of EnVen Energy, Increasing Operational Scale and Improving Financial Profile Through the Addition of Oil-Weighted, Deepwater Assets with Significant Infrastructure