Difference between revisions of "Bream Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 22: | Line 22: | ||
* 1988 - Oil production starts | * 1988 - Oil production starts | ||
* 2002 - Gas production begins with the completion of the Bream Gas Pipeline | * 2002 - Gas production begins with the completion of the Bream Gas Pipeline | ||
+ | * 2022 - Woodside became operator following merger with BHP | ||
+ | * 2022 - Exxon announces its intention to use the field as a CO2 storage facility | ||
+++ Geology === | +++ Geology === | ||
Line 31: | Line 33: | ||
# [http://killajoules.wikidot.com/archive:bhp-billiton-approves-bream-gas-pipeline-in-bass-str BHP Billiton Approves Bream Gas Pipeline in Bass Strait] | # [http://killajoules.wikidot.com/archive:bhp-billiton-approves-bream-gas-pipeline-in-bass-str BHP Billiton Approves Bream Gas Pipeline in Bass Strait] | ||
# [http://killajoules.wikidot.com/archive:bhp-billiton-announces-commencement-of-bream-pipelin BHP Billiton Announces Commencement of Bream Pipeline] | # [http://killajoules.wikidot.com/archive:bhp-billiton-announces-commencement-of-bream-pipelin BHP Billiton Announces Commencement of Bream Pipeline] | ||
+ | # [https://abarrelfull.blogspot.com/2023/08/woodside-completes-merger-with-bhp.html Woodside Completes Merger with BHP Petroleum] | ||
+ | # [https://abarrelfull.blogspot.com/2023/01/exxonmobil-begins-design-studies-for.html ExxonMobil begins design studies for South East Australia carbon capture hub in Gippsland] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Australia]] | [[category:Australia]] | ||
[[category:Woodside]] | [[category:Woodside]] | ||
+ | [[category:Exxon]] |
Latest revision as of 08:40, 30 August 2023
Summary Information
- Operator: Woodside
- Country: Australia
- Location: Offshore, Bass Strait
- Production start: 1988
- Partners: BHP Billiton / Exxon
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The field utilises a two Platforms, the Bream A a steel platform and Bream B, a concrete gravity structure
- Oil is sent to the Halibut Platform and transfered from there to shore by a subsea pipeline.
- A 51km gas pipeline runs 46km offshore from the Bream A platform, across the Gippsland coast near Paradise beach and then continues a further 5km onshore to the Longford Gas Conditioning Plant
Contractors
- **Global Maritime:** Warranty surveyor for launch, tow and installation of two gas pipelines
History
- 1969 - The Bream oil and gas field was discovered
- 1988 - Oil production starts
- 2002 - Gas production begins with the completion of the Bream Gas Pipeline
- 2022 - Woodside became operator following merger with BHP
- 2022 - Exxon announces its intention to use the field as a CO2 storage facility
+++ Geology ===
Links
- Offshore Oil And Gas Production Platforms In Australia
- Global Maritime Pipeline References
- BHP Billiton Approves Bream Gas Pipeline in Bass Strait
- BHP Billiton Announces Commencement of Bream Pipeline
- Woodside Completes Merger with BHP Petroleum
- ExxonMobil begins design studies for South East Australia carbon capture hub in Gippsland