Difference between revisions of "Jangkrik Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Eni * Country: Indonesia * Location: 3.42 Muara Bakau PSC, Kutei Basin, offshore Indonesia * Production start: 2017 * Partners: GDF Suez * Ty...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Eni | * Operator: Eni | ||
* Country: Indonesia | * Country: Indonesia | ||
Line 9: | Line 9: | ||
* Production Volume: Target volumes are 450 million standard cubic feet per day (mmscf/d), equivalent to 83,000 barrels of oil equivalent per day (boed) | * Production Volume: Target volumes are 450 million standard cubic feet per day (mmscf/d), equivalent to 83,000 barrels of oil equivalent per day (boed) | ||
− | + | === Description === | |
− | * Production is from ten deep-water subsea wells, connected to the newly built Floating Production Unit (FPU) “Jangkrik”. The gas, once processed onboard the FPU, flows via a dedicated 79km pipeline to the Onshore Receiving Facility, and then through the East Kalimantan Transportation System, finally reaching the | + | * Production is from ten deep-water subsea wells, connected to the newly built Floating Production Unit (FPU) “Jangkrik”. The gas, once processed onboard the FPU, flows via a dedicated 79km pipeline to the Onshore Receiving Facility, and then through the East Kalimantan Transportation System, finally reaching the [[Bontang LNG Terminal]]. |
* The development consists of 51 kilometers of umbilicals, five manifolds and seven SSIV(2) subsea structures | * The development consists of 51 kilometers of umbilicals, five manifolds and seven SSIV(2) subsea structures | ||
− | * The | + | * The [[Merakes Gas Field]] is to be tied back to the Jangkrik platform |
− | + | === Contractors === | |
* **FMC Technologies:** Supply of subsea trees, manifolds, jumpers and connection systems, umbilicals, tooling and associated topside and subsea controls systems | * **FMC Technologies:** Supply of subsea trees, manifolds, jumpers and connection systems, umbilicals, tooling and associated topside and subsea controls systems | ||
* **McDermott:** Fabrication of subsea manifolds and subsea safety isolation valve modules | * **McDermott:** Fabrication of subsea manifolds and subsea safety isolation valve modules | ||
* **Technip:** engineering, procurement, commissioning and installation of: | * **Technip:** engineering, procurement, commissioning and installation of: | ||
− | + | ** 36 kilometers of flexible risers and flowlines with diameters ranging from 4" to 14", | |
− | + | ** 195 kilometers of pipeline with diameter ranging from 4" to 24", | |
− | + | ** subsea equipment which includes mid-water arch and flowline end termination. | |
− | * **Oceaneering:** Supply of | + | * **Oceaneering:** Supply of steel tube production control umbilicals, with a total combined length of approximately 31 miles (50 kilometers) |
− | + | === History === | |
* 2009 - An initial exploration campaign was successfully carried out | * 2009 - An initial exploration campaign was successfully carried out | ||
* 2009 - GDF Suez acquires 45% of the block | * 2009 - GDF Suez acquires 45% of the block | ||
Line 32: | Line 32: | ||
* 2017 - Gas production started | * 2017 - Gas production started | ||
− | + | === Geology === | |
* Excellent quality reservoir sands of Pliocene age | * Excellent quality reservoir sands of Pliocene age | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/archive:eni-announces-successful-appraisal-of-jangkrik-gas-d Eni announces successful appraisal of Jangkrik - gas discovery in Indonesia] | # [http://killajoules.wikidot.com/archive:eni-announces-successful-appraisal-of-jangkrik-gas-d Eni announces successful appraisal of Jangkrik - gas discovery in Indonesia] | ||
# [http://killajoules.wikidot.com/archive:gdf-suez-pursues-its-development-in-the-asia-pacific GDF SUEZ pursues its development in the Asia-Pacific region, entering into exploration-production in Indonesia] | # [http://killajoules.wikidot.com/archive:gdf-suez-pursues-its-development-in-the-asia-pacific GDF SUEZ pursues its development in the Asia-Pacific region, entering into exploration-production in Indonesia] |
Revision as of 16:05, 23 June 2023
Summary Information
- Operator: Eni
- Country: Indonesia
- Location: 3.42 Muara Bakau PSC, Kutei Basin, offshore Indonesia
- Production start: 2017
- Partners: GDF Suez
- Type: Gas
- Estimated Reserves:
- Production Volume: Target volumes are 450 million standard cubic feet per day (mmscf/d), equivalent to 83,000 barrels of oil equivalent per day (boed)
Description
- Production is from ten deep-water subsea wells, connected to the newly built Floating Production Unit (FPU) “Jangkrik”. The gas, once processed onboard the FPU, flows via a dedicated 79km pipeline to the Onshore Receiving Facility, and then through the East Kalimantan Transportation System, finally reaching the Bontang LNG Terminal.
- The development consists of 51 kilometers of umbilicals, five manifolds and seven SSIV(2) subsea structures
- The Merakes Gas Field is to be tied back to the Jangkrik platform
Contractors
- **FMC Technologies:** Supply of subsea trees, manifolds, jumpers and connection systems, umbilicals, tooling and associated topside and subsea controls systems
- **McDermott:** Fabrication of subsea manifolds and subsea safety isolation valve modules
- **Technip:** engineering, procurement, commissioning and installation of:
- 36 kilometers of flexible risers and flowlines with diameters ranging from 4" to 14",
- 195 kilometers of pipeline with diameter ranging from 4" to 24",
- subsea equipment which includes mid-water arch and flowline end termination.
- **Oceaneering:** Supply of steel tube production control umbilicals, with a total combined length of approximately 31 miles (50 kilometers)
History
- 2009 - An initial exploration campaign was successfully carried out
- 2009 - GDF Suez acquires 45% of the block
- 2010 - Second successful appraisal drilling completed
- 2011 - Eni makes a new discovery in the Kutei Basin, offshore Indonesia, at Jangkrik North East 1 NFW
- 2014 - FMC & Technip awarded subsea contracts
- 2015 - LNG sales agreement signed
- 2017 - Gas production started
Geology
- Excellent quality reservoir sands of Pliocene age
Links
- Eni announces successful appraisal of Jangkrik - gas discovery in Indonesia
- GDF SUEZ pursues its development in the Asia-Pacific region, entering into exploration-production in Indonesia
- Eni makes a new discovery in the Kutei Basin, offshore Indonesia, at Jangkrik North East 1 NFW
- FMC Technologies Awarded $720 Million Contract for Subsea Systems for eni's Jangkrik Project in Indonesia
- Technip wins Jangkrik subsea package in Indonesia
- Oceaneering Announces Jangkrik Umbilicals Contract
- McDermott Awarded Subsea Fabrication Contract by FMC Technologies for Jangkrik Complex Offshore Kalimantan, Indonesia
- ENGIE signs its first Jangkrik LNG Sale & Purchase Agreements
- Eni starts production from Jangkrik Project, deep offshore Indonesia, ahead of schedule