Difference between revisions of "P-74 FPSO"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Name: P 74 FPSO * Field: [[[Buzios Oil And Gas Field]]] * Country: Brazil * Ownership: Petrobras * Website: http://www.petrobras.com.br/ * Field Operate...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Name: P 74 FPSO
 
* Name: P 74 FPSO
* Field: [[[Buzios Oil And Gas Field]]]
+
* Field: [[Búzios Oil and Gas Field]]
 
* Country: Brazil
 
* Country: Brazil
 
* Ownership: Petrobras
 
* Ownership: Petrobras
Line 8: Line 8:
 
* Field Operated By: Petrobras
 
* Field Operated By: Petrobras
 
* Capacity: 150,000 bpd  
 
* Capacity: 150,000 bpd  
* Year of Completion:  
+
* Year of Completion: 2018
  
+++ Brief Description
+
=== Brief Description ===
  
* FPSO P-74 will be the first platform completed for the exploration of the pre-salt fields located in the Transfer of Rights region. The platform will be capable of producing up to 150,000 barrels/day and of compressing 7 million cubic meters of natural gas/day  
+
* FPSO P-74 was the first platform completed for the exploration of the pre-salt fields located in the Transfer of Rights region. The platform is capable of producing up to 150,000 barrels/day and of compressing 7 million cubic meters of natural gas/day  
 
* The vessel is a converted VLCC
 
* The vessel is a converted VLCC
  
+++ Contractors
+
=== Contractors ===
 
*  **Norberto Odebrecht / UTC Engenharia:** Hull conversion
 
*  **Norberto Odebrecht / UTC Engenharia:** Hull conversion
 
* **Toyo:** EPCI contract to install topsides units
 
* **Toyo:** EPCI contract to install topsides units
Line 21: Line 21:
 
* **GE Oil & Gas:** Supply of gas turbines and electric generators, turbocompression trains and electric motor driven compressors for gas main, export services and CO2 re-injection
 
* **GE Oil & Gas:** Supply of gas turbines and electric generators, turbocompression trains and electric motor driven compressors for gas main, export services and CO2 re-injection
  
+++ Status
+
=== Status ===
* Under construction
+
* In operation
  
+++ History
+
=== History ===
 
* 2012 - Norberto Odebrecht & UTC Engenharia awarded hull conversion contracts
 
* 2012 - Norberto Odebrecht & UTC Engenharia awarded hull conversion contracts
 
* 2013 - Toyo awarded topsides contract
 
* 2013 - Toyo awarded topsides contract
 +
* 2018 - The vessel arrived at the field
  
+++ Other Information
+
+++ Other Information ===
  
 
* -
 
* -
  
+++ Links
+
=== Links ===
  
 
# [http://killajoules.wikidot.com/archive:petrobras-signs-agreement-to-convert-platform-hulls Petrobras signs agreement to convert platform hulls for transfer of rights areas]
 
# [http://killajoules.wikidot.com/archive:petrobras-signs-agreement-to-convert-platform-hulls Petrobras signs agreement to convert platform hulls for transfer of rights areas]
Line 39: Line 40:
 
# [http://killajoules.wikidot.com/blog:4199 TOYO’s Brazil Affiliate Awarded FPSO Topsides Units]
 
# [http://killajoules.wikidot.com/blog:4199 TOYO’s Brazil Affiliate Awarded FPSO Topsides Units]
 
# [http://killajoules.wikidot.com/blog:4410 New field development project to Aibel]
 
# [http://killajoules.wikidot.com/blog:4410 New field development project to Aibel]
 +
# [https://abarrelfull.blogspot.com/2023/06/platform-p-74-arrives-at-buzios-field.html Platform P-74 arrives at the Búzios field, in the Santos Basin pre-salt]
 +
 +
[[Category:FSPO]]
 +
[[Category:Brazil]]
 +
[[Category:Petrobras]]

Latest revision as of 13:55, 10 June 2023

Summary Information

Brief Description

  • FPSO P-74 was the first platform completed for the exploration of the pre-salt fields located in the Transfer of Rights region. The platform is capable of producing up to 150,000 barrels/day and of compressing 7 million cubic meters of natural gas/day
  • The vessel is a converted VLCC

Contractors

  • **Norberto Odebrecht / UTC Engenharia:** Hull conversion
  • **Toyo:** EPCI contract to install topsides units
  • **Aibel:** Construction of a total of five modules
  • **GE Oil & Gas:** Supply of gas turbines and electric generators, turbocompression trains and electric motor driven compressors for gas main, export services and CO2 re-injection

Status

  • In operation

History

  • 2012 - Norberto Odebrecht & UTC Engenharia awarded hull conversion contracts
  • 2013 - Toyo awarded topsides contract
  • 2018 - The vessel arrived at the field

+++ Other Information ===

  • -

Links

  1. Petrobras signs agreement to convert platform hulls for transfer of rights areas
  2. GE Oil & Gas Wins US$500 Million Petrobras Contract
  3. Petrobas have signed module construction contracts for P-74 and P-76
  4. TOYO’s Brazil Affiliate Awarded FPSO Topsides Units
  5. New field development project to Aibel
  6. Platform P-74 arrives at the Búzios field, in the Santos Basin pre-salt